Field

Transport in Poland

171 strategic investments in this field. In progress: 57, completed: 102. The strip below carries the full split by status and the value-by-stage figure. The list is ordered by momentum, so whatever is closest to opening comes first, and each record carries a link to its source.

171projects in the database
PLN 544 billionvalue-by-stage (nominal, est.)
57in progress
102completed
9planned
2paused
1cancelled

155 of 171 records enter the sum: those with a stated cost, excluding parent programmes (so they are not counted alongside their sub-projects), cancelled records and foreign purchases. Amounts are nominal, in prices from various years, with no inflation adjustment; those recorded in a foreign currency are converted at a fixed rate of EUR 4.30 / USD 4.00 / SEK 0.38. An inventory for comparison, not a ledger of state spending.

Projects in this field

Ordered by momentum: build stage and proximity to opening. Each row carries the status, the opening year and the source count.

  1. 75 Stadler FLIRT trains for Koleje MazowieckiePLN 4.8 billionunder constructionin the home stretch20274 src.
  2. Tram to Mistrzejowice – KST Stage IV (Krakow, PPP)PLN 1.9 billionunder constructionin the home stretch2026under a year late7 src.
  3. Reconstruction of the runway and taxiways at Rzeszów-Jasionka Airport (CEF Military Mobility)PLN 0.11 billionunder constructionin the home stretch20267 src.
  4. Completion and expansion of Warsaw metro line II (eastern-northern and western sections)PLN 10 billionunder construction2026about 4 years late7 src.
  5. S1 Mysłowice (Kosztowy) – Bielsko-Biała (Suchy Potok)PLN 2.3 billionunder construction20275 src.
  6. S10 Expressway Bydgoszcz – ToruńPLN 2.1 billionunder construction20273 src.
  7. Vistula Spit Canal and Waterway to ElblągPLN 2.0 billionunder construction2027about 4 years late9 src.
  8. S19 Dukla – Barwinek (state border)PLN 1.5 billionunder construction20274 src.
  9. Szczecin Metropolitan RailwayPLN 1.4 billionunder construction202676 mo. late6 src.
  10. Expansion and Modernisation of Poznań-Ławica AirportPLN 1.3 billionunder construction20276 src.
  11. S19 Babica – Jawornik (ES-26 viaduct)PLN 1.3 billionunder construction20273 src.
  12. T5 Terminal at the Port of Gdańsk – offshore wind installation terminalPLN 1.2 billionunder construction20264 src.
  13. S19 Lubartów – Lublin (Lubartów Północ – Lublin Rudnik interchanges)PLN 0.84 billionunder construction20274 src.
  14. Expansion of Wrocław Airport (Operational Area, Stage I)PLN 0.38 billionunder construction20265 src.
  15. S7 Warsaw – Gdańsk / Warsaw – Krakow (corridor-closing sections)n/aunder construction20267 src.
  16. S19 Rzeszów Południe – Babica (TBM tunnel)PLN 3.0 billionunder construction20286 src.
  17. Expansion of the A2 Motorway Łódź–Warsaw with a Third/Fourth LanePLN 1.5 billionunder construction20285 src.
  18. Line 7 Warszawa Wawer – Otwock (four tracks)PLN 1.4 billionunder construction20284 src.
  19. Improving access to the Port of Gdańsk – modernization of waterway 2 (4 quays)PLN 0.53 billionunder construction20287 src.
  20. S16 Olsztyn Wschód – Barczewo (second carriageway)PLN 0.51 billionunder construction20284 src.
  21. Gdańsk Airport Investment Programme 2025–2028PLN 0.50 billionunder construction20289 src.
  22. S17 Expressway Piaski – Hrebenne (border with Ukraine)n/aunder construction20288 src.
  23. Kolej Plus programme (completing local and regional rail infrastructure)PLN 13 billionunder construction20294 src.
  24. A2 Motorway eastward: Warsaw (Lubelska) – Biała Podlaska – Terespol/KoroszczynPLN 4.6 billionunder construction20295 src.
  25. Purchase of 63 Newag multi-system electric locomotives for PKP Intercity with option for 32PLN 2.8 billionunder construction20294 src.
  26. CPK Airport / Port Polska (Baranów–Wiskitki–Teresin)PLN 43 billionin preparation2032about 5 years late8 src.
  27. Programme for the Construction of 100 Bypasses for 2020–2030PLN 28 billionunder construction20307 src.
  28. Podłęże – Piekiełko: 58 km new railway line + modernisation of line 104 Chabówka – Nowy SączPLN 17 billionunder construction20307 src.
  29. Deepwater Container Terminal in Świnoujście (Przylądek Pomerania)PLN 10 billionunder construction203011 src.
  30. Outer Port at the Port of Gdynia (deep-water container terminal, PPP)PLN 5.0 billionplanned6 src.
  31. Reconstruction of Warszawa Wschodnia stationPLN 3.6 billionin preparation20295 src.
  32. Line 12 Skierniewice – Czachówek – PilawaPLN 2.7 billionin preparation20295 src.
  33. Line 202 Gdynia Chylonia – Lębork (stage II)PLN 2.6 billionin preparation20294 src.
  34. Cross-city rail tunnel in Łódź (Łódź Fabryczna – Łódź Kaliska/Żabieniec)PLN 2.3 billionpaused203112 src.
  35. 90 Pesa Twist 3.0 trams for MPK KrakówPLN 1.8 billionin preparation4 src.
  36. Katowice Airport Investment Programme 2024–2032 (new main terminal)PLN 1.8 billionin preparation20325 src.
  37. Line 8: Sędziszów – Sitkówka Nowiny (two contracts)PLN 1.5 billionin preparation20294 src.
  38. Modernization and expansion of Chopin Airport in WarsawPLN 0.94 billionin preparation20296 src.
  39. GPKM stage VA: Gdańsk Południe – Wrzeszcz tram linePLN 0.80 billionin preparation20294 src.
  40. 20 Pesa Twist 3.0 trams for GAiT GdańskPLN 0.52 billionplanned20294 src.
  41. Central Communication Port Programme (CPK Multi-Year Programme 2024–2032)PLN 132 billionunder construction2032about 5 years late12 src.
  42. High-Speed Rail "Y": Warsaw – CPK – Łódź – Wrocław/PoznańPLN 80 billionunder construction20359 src.
  43. S19 Via Carpatia Expressway (Polish section)PLN 27 billionunder construction2031about 5 years late8 src.
  44. S61 Via Baltica expresswayPLN 11 billioncompletedfreshly completed2025about 4 years late10 src.
  45. Purchase of 42 double-deck Alstom Coradia Max trains for PKP IntercityPLN 6.9 billionunder construction20324 src.
  46. A1 motorway Toruń–Stryków (GDDKiA's central section, POIiŚ)PLN 5.7 billioncompleted20146 src.
  47. A4 Motorway Tarnów (Krzyż interchange) – Rzeszów (Rzeszów Wschód interchange), including a section of the S19 expressway (Rzeszów Zachód interchange – Świlcza interchange)PLN 5.3 billioncompleted20148 src.
  48. S8 Expressway, Walichnowy interchange – Łódź (A1) section (Wrocław – Łódź direction)PLN 5.1 billioncompleted20145 src.
  49. Modernisation of railway line E30/C-E30 Kraków – Rzeszów (Podłęże – Rzeszów section, stage III)PLN 4.7 billioncompleted2017about 3 years late6 src.
  50. Warsaw Southern Bypass S2 with the tunnel under UrsynówPLN 4.6 billioncompleted20218 src.
  51. Expansion of Kraków Airport (New Investment Plan: Terminal Stage I + New Runway)PLN 4.2 billionunder construction20326 src.
  52. Warsaw Metro Line 2 (M2) – Central Section (Rondo Daszyńskiego – Dworzec Wileński)PLN 4.2 billioncompleted20155 src.
  53. Wrocław Motorway Bypass A8 (including the Rędzin Bridge over the Oder)PLN 4.0 billioncompleted20114 src.
  54. S17 Expressway Warsaw (Zakręt) – Kurów Zachód (part of the Warsaw – Lublin route)PLN 4.0 billioncompleted20228 src.
  55. Modernization of the E59 line Poznań Główny – Szczecin DąbiePLN 4.0 billioncompleted20258 src.
  56. A1 Motorway Tuszyn–Częstochowa (completion of the A1)PLN 3.7 billioncompleted20217 src.
  57. Line 7 Warszawa – Otwock – Lublin (stage I)PLN 3.5 billioncompleted20233 src.
  58. S7 Expressway Gdańsk – Elbląg (Koszwały – Kazimierzowo)PLN 3.2 billioncompleted20186 src.
  59. Modernisation of railway line E65 (C-E65), Warsaw – Gdynia section (LK9)PLN 3.2 billioncompleted7 src.
  60. A1 Motorway Gdańsk–Toruń (Gdańsk Transport Company concession section)PLN 3.1 billioncompleted20116 src.
  61. A1 motorway Częstochowa – PyrzowicePLN 3.0 billioncompleted20195 src.
  62. S6 completion: Koszalin – Słupsk – Bożepole WielkiePLN 2.9 billioncompletedfreshly completed20268 src.
  63. Tri-City Metropolitan Ring Road (S6)PLN 2.9 billioncompletedfreshly completed2025under a year late13 src.
  64. Purchase of Pendolino ED250 trains (PKP Intercity)PLN 2.6 billioncompleted20149 src.
  65. Reconstruction of Warszawa Zachodnia StationPLN 2.6 billioncompletedfreshly completed2025about 2 years late7 src.
  66. S7 Naprawa – Skomielna Biała section with the tunnel under Luboń Mały (Zakopianka)PLN 2.5 billioncompleted2022about 1 year late4 src.
  67. S5 Expressway Poznań – WrocławPLN 2.4 billioncompleted20198 src.
  68. S3 Expressway Szczecin – Gorzów WielkopolskiPLN 2.3 billioncompleted20106 src.
  69. A1 motorway Sośnica (Gliwice) – Gorzyczki (the Silesian A1 section, via Świerklany)PLN 2.2 billioncompleted20125 src.
  70. Works on railway line E20 on the Warsaw – Poznań section, remaining works, Sochaczew – Swarzędz section (second modernisation of E20)PLN 2.2 billioncompleted202337 mo. late8 src.
  71. S8 Expressway Konotopa – Powązkowska (Trasa Armii Krajowej, Warsaw)PLN 2.1 billioncompleted20115 src.
  72. S3 Expressway, Gorzów Wielkopolski – Sulechów sectionPLN 2.1 billioncompleted20145 src.
  73. Baltic Hub T3 – the third deep-water container terminal in GdańskPLN 2.0 billioncompletedfreshly completed202510 src.
  74. Modernization of the E30 railway line Katowice – KrakowPLN 2.0 billionunder construction6 src.
  75. S7 Warsaw – Grójec (Lotnisko – Lesznowola – Grójec)PLN 2.0 billioncompleted20236 src.
  76. S3 Expressway Nowa Sól – Legnica (Kaźmierzów – Legnica section)PLN 2.0 billioncompleted2021about 3 years late6 src.
  77. Modernization of the Świnoujście–Szczecin fairway to 12.5 mPLN 2.0 billioncompleted20227 src.
  78. Modernisation of railway line no. 8, Warszawa Okęcie – Radom section (LOT A-F)PLN 1.9 billioncompleted20235 src.
  79. Purchase of up to 213 trams for Tramwaje Warszawskie (Hyundai Rotem contract, 2019)PLN 1.8 billioncompletedfreshly completed20248 src.
  80. A1 motorway Toruń Południe – Kowal (Czerniewice–Kowal section, part of the A1 Toruń–Stryków build)PLN 1.8 billioncompleted2014about 2 years late7 src.
  81. A4 Motorway Jarosław – Korczowa (Ukrainian border)PLN 1.8 billioncompleted20136 src.
  82. S3 Bolków – Kamienna Góra with the TS-26 tunnel (S3 Legnica–Lubawka)PLN 1.8 billioncompletedfreshly completed20242 mo. late8 src.
  83. New Łódź Fabryczna Station (with multimodal hub)PLN 1.8 billioncompleted201622 mo. late12 src.
  84. Modernisation of railway line E59, Wrocław – Poznań section (line no. 271)PLN 1.7 billioncompleted2023about 3 years late4 src.
  85. Siekierkowski Bridge and Siekierkowska Route in WarsawPLN 1.6 billioncompleted20077 src.
  86. Purchase of 20 Stadler/Newag FLIRT (ED160) electric multiple units for PKP IntercityPLN 1.6 billioncompleted20154 src.
  87. S7 Expressway – Southern Gdańsk Bypass (Straszyn – Koszwały)PLN 1.6 billioncompleted20124 src.
  88. Integrated Project for the modernisation and development of tram infrastructure in the Śląsko-Zagłębiowska Agglomeration, together with the purchase of tram rolling stock (POIiŚ 2014-2020)PLN 1.6 billioncompleted20235 src.
  89. A1 motorway Pyrzowice – Piekary ŚląskiePLN 1.5 billioncompleted20126 src.
  90. Purchase of 186 PESA 120Na Swing trams for Tramwaje WarszawskiePLN 1.5 billioncompleted20134 src.
  91. S52 Northern Krakow Bypass with tunnelsPLN 1.4 billioncompletedfreshly completed20245 src.
  92. S1 Węgierska Górka bypass (Przybędza – Milówka)PLN 1.4 billioncompletedfreshly completed2025about 2 years late7 src.
  93. Construction of the S3 Expressway Gorzów Wielkopolski – Nowa Sól, Sulechów (Kruszyna interchange) – Nowa Sól section (second carriageway of the S3 and second carriageways of the Gorzów Wielkopolski and Międzyrzecz bypasses)PLN 1.3 billioncompleted20184 src.
  94. S14 Łódź Western Bypass (Lublinek – Słowik)PLN 1.3 billioncompleted20235 src.
  95. Purchase of 20 Pesa Dart ED161 electric multiple units for PKP IntercityPLN 1.3 billioncompleted20162 mo. late4 src.
  96. Deepening of the approach fairway and internal basins of the Port of Gdynia to 16 mPLN 1.3 billioncompletedfreshly completed2026about 2 years late7 src.
  97. S69 Expressway (now S1) Bielsko-Biała – Żywiec – ZwardońPLN 1.2 billioncompleted20155 src.
  98. S8 Expressway Wyszków – Mazowieckie/Podlaskie voivodeship border (Warsaw – Białystok direction)PLN 1.2 billioncompleted20187 src.
  99. Maria Skłodowska-Curie Bridge (North Bridge) in Warsaw with the North Bridge RoutePLN 1.2 billioncompleted20127 src.
  100. A4 Motorway Zgorzelec – KrzyżowaPLN 1.1 billioncompleted20094 src.
  101. Modernisation of railway line E20, Siedlce – Terespol sectionPLN 1.1 billioncompleted20155 src.
  102. A1 motorway Świerklany – Gorzyczki (Czech border, the Mszana bridge)PLN 1.1 billioncompleted201425 mo. late6 src.
  103. Purchase of 35 Siemens Inspiro trains for the Warsaw MetroPLN 1.1 billioncompleted20135 src.
  104. A1 motorway Stryków (Łódź Północ) – Tuszyn (eastern Łódź bypass)PLN 1.0 billioncompleted20167 src.
  105. Protective breakwater for the external port in Świnoujście (LNG terminal shelter)PLN 1.0 billioncompleted20134 src.
  106. 110 Stadler Lajkonik trams for MPK KrakówPLN 1.0 billioncompleted20183 src.
  107. A4 Motorway Rzeszów Wschód – Jarosław ZachódPLN 0.99 billioncompleted20164 src.
  108. Tunnel under the Świna in ŚwinoujściePLN 0.91 billioncompleted2023under a year late5 src.
  109. Pomeranian Metropolitan Railway (new line Gdańsk Wrzeszcz – Airport – Kartuzy/Kościerzyna)PLN 0.91 billioncompleted20156 src.
  110. Reconstruction of national road DK18 to A18 motorway standard (southern carriageway)PLN 0.90 billioncompleted20236 src.
  111. Modernisation of railway line Warsaw – Łódź (lines no. 1 and 17), stages I and IIPLN 0.87 billioncompleted20066 src.
  112. DCT Gdańsk deepwater container terminal (Baltic Hub) – Terminal T2PLN 0.86 billioncompleted20167 src.
  113. Łagiewnicka Route in Kraków (road with tram line)PLN 0.84 billioncompleted20223 src.
  114. A4 Motorway Kraków – SzarówPLN 0.84 billioncompleted20093 src.
  115. DCT Gdańsk Deepwater Container Terminal (Baltic Hub) – Terminal T1PLN 0.80 billioncompleted20074 src.
  116. Warsaw-Radom Airport (expansion of the Radom-Sadków airport)PLN 0.80 billioncompleted2023about 2 years late12 src.
  117. Modernisation of tram and trolleybus infrastructure in the Upper Silesian Agglomeration, together with accompanying infrastructure (POIiŚ 2007–2013)PLN 0.80 billioncompleted20154 src.
  118. W-Z Route in Łódź (Retkinia–Widzew tram line, extended to Olechów)PLN 0.75 billioncompleted20156 src.
  119. Wrocław – Tramwaj Plus Programme (Integrated Rail Transport System in the Agglomeration and in Wrocław – Stage I)PLN 0.74 billioncompleted20126 src.
  120. S7 Expressway Skarżysko-Kamienna – WystępaPLN 0.72 billioncompleted20114 src.
  121. Tram to Wilanów (Warsaw)PLN 0.69 billioncompletedfreshly completed20244 mo. late10 src.
  122. S8 Expressway Jeżewo – Białystok (to the Choroszcz interchange)PLN 0.68 billioncompleted20127 src.
  123. Construction of the Olsztyn tram network with a Solaris Tramino fleet (revival of trams)PLN 0.65 billioncompleted201517 mo. late6 src.
  124. S16 Borki Wielkie – Mrągowo with the Mrągowo bypassPLN 0.63 billioncompletedfreshly completed20244 src.
  125. Krakow Fast Tram stage III: Krowodrza Górka - Górka NarodowaPLN 0.60 billioncompleted20234 src.
  126. Modernization of the fairway and expansion of quays in the Inner Port in Gdańsk (stage 1)PLN 0.60 billioncompleted20225 src.
  127. S5 Świecie Południe – Bydgoszcz Północ (completion)PLN 0.58 billioncompleted20223 src.
  128. Tram Route to Naramowice (Poznań)PLN 0.55 billioncompleted202210 src.
  129. Purchase of 15 used diesel multiple units for Polregio with option for 8PLN 0.52 billionunder construction3 src.
  130. ORLEN Maritime Transshipment Terminal on the Martwa Wisła at the Gdańsk RefineryPLN 0.50 billioncompletedfreshly completed20268 src.
  131. Expansion of Warsaw-Modlin Airport (Stages I and II)PLN 0.50 billionunder construction8 src.
  132. S19 Niedrzwica Duża – Kraśnik PółnocPLN 0.50 billioncompleted20226 src.
  133. S22 Expressway Elbląg – Grzechotki (border with Russia)PLN 0.48 billioncompleted20086 src.
  134. Lublin Airport (Świdnik): construction of a new regional airportPLN 0.48 billioncompleted20124 src.
  135. Warsaw-Modlin AirportPLN 0.45 billioncompleted20125 src.
  136. Construction of the tram line to Fordon in BydgoszczPLN 0.44 billioncompleted20167 src.
  137. Expansion of the Passenger Terminal at Kraków-Balice Airport (2013–2016)PLN 0.41 billioncompleted201616 mo. late5 src.
  138. Expansion of Warsaw Chopin Airport (Terminal A)PLN 0.40 billioncompleted20156 src.
  139. A4 Motorway Krakow–Katowice (Poland's first toll motorway)PLN 0.38 billioncompleted4 src.
  140. Łódź Regional Tramway (ŁTR)PLN 0.28 billioncompleted20085 src.
  141. Os. Lecha – Franowo tram route (with tunnel) in PoznańPLN 0.26 billioncompleted20126 src.
  142. Kraków Fast Tram (KST): the 'Kraków Premetro' Programme (Stage I with Tunnel, Stage II)PLN 0.21 billioncompleted20158 src.
  143. Świnoujście Offshore Terminal – ORLEN Neptun Offshore Wind Farm Installation TerminalPLN 0.17 billioncompletedfreshly completed20258 src.
  144. A2 Motorway (Świecko–Poznań–Łódź–Warsaw section)n/acompleted201210 src.
  145. S8 Expressway Wrocław (Magnice) – Kłodzkon/aunder construction20334 src.
  146. Warsaw Metro – Line 1 (M1) Kabaty–Młocinyn/acompleted20088 src.
  147. Central Trunk Line (Line 4) upgrade to 200 km/h for Pendolino (Grodzisk Maz. – Zawiercie)n/acompleted20175 src.
  148. Modernization of line No. 201 Maksymilianowo – Gdynia (coal trunk line, access to the Port of Gdynia)n/aunder construction2032about 4 years late4 src.
  149. Naftoport – Marine Crude Oil and Fuels Transhipment Terminal at Port Północny, Gdańskn/acompleted19915 src.
  150. First modernisation of railway line E20 on the Warsaw – Poznań – Kunowice section (PHARE/ISPA/EIB, 160 km/h)n/acompleted20094 src.
  151. Poznań Fast Tram (PST), northern trunk (“Pestka”)n/acompleted19975 src.
  152. Rail Baltica – Polish E75 Section (Warsaw – Białystok – Ełk – Trakiszki)n/aunder construction7 src.
  153. Terminal 1 of Warsaw-Okęcie Airport (1992)n/acompleted19925 src.
  154. Warsaw Agglomeration Ring Road (A50/S50)PLN 18 billionplanned20355 src.
  155. Krakow Metro – Line 1 (M1)PLN 13 billionplanned7 src.
  156. Central Port in Gdańsk (ZMPG concept)PLN 13 billionplanned5 src.
  157. Silesian CanalPLN 11 billionplanned6 src.
  158. Warsaw railway junction: modernization of the cross-city line + second cross-city line (tunnel under the Vistula)PLN 9.0 billionplanned20405 src.
  159. Warsaw Metro Line III – Stage I (Praga-Południe, Stadion Narodowy – Gocław)PLN 6.0 billionplanned20326 src.
  160. S6 Szczecin Western Bypass: Police – Goleniów with the Oder tunnelPLN 5.3 billionin preparation20333 src.
  161. S19 Jawornik – Lutcza (Kamieniec tunnel)PLN 1.9 billionin preparation20316 src.
  162. S19 Lutcza – Domaradz (Hyb tunnel)PLN 1.4 billionin preparation20307 src.
  163. S74 Cedzyna – Łagów (with the Łagów bypass)PLN 1.2 billionin preparation20285 src.
  164. S11 Przygodzice – Kępno Północ (Ostrzeszów)PLN 1.1 billionin preparation20296 src.
  165. S19 Domaradz – Krosno (Iskrzynia)PLN 1.1 billionpaused6 src.
  166. S11 Oborniki – Poznań Północ with the Oborniki bypassPLN 0.85 billionin preparation20284 src.
  167. S12 Dorohucza – Chełm ZachódPLN 0.76 billionin preparation20284 src.
  168. Protective Breakwaters of the Outer Port in GdyniaPLN 0.54 billionin preparation20285 src.
  169. Expansion of the A4 Motorway Krzyżowa–Legnica–Wrocław (+ S5 Sobótka–Bolków)n/aplanned5 src.
  170. Tramwaje Śląskie – modernization and development of tram infrastructure in the Metropolis GZM (Górnośląsko-Zagłębiowska Metropolia) (FEnIKS 2021-2027)PLN 1.3 billionin progress8 src.
  171. CPK Rail Spokes (hub-and-spoke model)n/acancelled9 src.

All fields

The same catalogue, a different cut of it. Every record belongs to exactly one field, so these counts add up to the whole database.