S7 Expressway – Southern Gdańsk Bypass (Straszyn – Koszwały)
The Southern Gdańsk Bypass is a 17.9 km section of the S7 expressway connecting the A1 motorway and the Tricity ring road (S6) with national road no. 7 at Koszwały, running along the southern edge of the Gdańsk agglomeration. The investor was the General Directorate for National Roads and Motorways (GDDKiA), Gdańsk branch. Construction began in mid-October 2009, and the route was opened to use on 9 June 2012. The total cost of the project was PLN 1,580,833,094.37; the project was co-financed from European Union funds under the Cohesion Fund (Operational Programme Infrastructure and Environment), whose contribution amounted to 85% of eligible costs (PLN 1,215,937,101.41). Several interchanges and numerous engineering structures were built along the route, including one of the longest viaducts in Poland. The road took transit traffic out of the centre of Gdańsk and completed the southern part of the Tricity's ring road system.
How it went
Assessment: settled, as of 9 Jun 2012. This is our reading, not a verdict, and we show it only where a quote from a source listed below stands behind it. Of the four, 2 carry no assessment yet, one has an assessment with no confirmed quote. How to read this section
Timeline
Change history
- 9 Jun 2012stage: operational
- Oct 2009stage: construction
Significance
The Southern Gdańsk Bypass completed the southern part of the Tricity's ring road system, connecting the A1 motorway and the Tricity ring road (S6) with national road no. 7 towards Elbląg and Warsaw. The route took transit traffic, including heavy goods vehicles, out of the centre of Gdańsk and became part of the S7 expressway corridor and European route E77.
Sources 4 · 3 independent · 2 archived
Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.
Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.
A “wiki” mark means the value stands on Wikipedia alone. Our count of independent sources treats it as zero, so read such a place as less firmly documented than the rest of the card – that applies to an outcome row, a figure, a date and a status alike.
- Generalna Dyrekcja Dróg Krajowych i Autostrad2012StatusStageCostInvestorFundingDelivery
Status · Stage · Delivery09.06.2012 r. - oddanie trasy do użytkowania
Costłączny koszt inwestycji wynosi 1 580 833 094,37 zł
InvestorInwestor: Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Gdańsku
FundingWkład Funduszu Spójności wynosi 85% kosztów kwalifikowanych tj. 1 215 937 101,41 zł
FundingProjekt finansowany jest ze środków Krajowego Funduszu Drogowego oraz współfinansowany przez Unię Europejską z Funduszu Spójności
- Wikipedia (pl)Construction startDeliveryStatus
Construction startPrace budowlane rozpoczęły się w połowie października 2009 roku
Delivery · StatusObwodnicę otwarto 9 czerwca 2012 bez węzłów Gdańsk Port, Gdańsk Lipce oraz Koszwały[8].
- Miasto Gdańsk (gdansk.pl)11 Jun 2012Status
StatusNowa droga łączy autostradę A1, drogę ekspresową S6 Obwodnicę Trójmiasta i wyprowadza ruch bezpośrednio w kierunku Warszawy.
- Trojmiasto.pl8 Jun 2012Investor
InvestorBudowa Południowej Obwodnicy Gdańska to inwestycja zlecona przez gdański oddział Generalnej Dyrekcji Dróg Krajowych i Autostrad.