Map

Where it’s being built.

An overview by voivodeship – circle size is the number of projects in the region. The full, filterable database with the point map lives in the “All projects” section.

Śląskie: 45 projects · PLN 110 billionOpolskie: 8 projects · PLN 17.6 billionWielkopolskie: 33 projects · PLN 148 billionZachodniopomorskie: 29 projects · PLN 74.9 billionŚwiętokrzyskie: 13 projects · PLN 13.9 billionKujawsko-pomorskie: 25 projects · PLN 61.5 billionPodlaskie: 15 projects · PLN 52.0 billionDolnośląskie: 42 projects · PLN 177 billionPodkarpackie: 30 projects · PLN 74.4 billionMałopolskie: 35 projects · PLN 80.3 billionPomorskie: 70 projects · PLN 443 billionWarmińsko-mazurskie: 19 projects · PLN 66.9 billionŁódzkie: 29 projects · PLN 129 billionMazowieckie: 105 projects · PLN 403 billionLubelskie: 22 projects · PLN 55.9 billionLubuskie: 13 projects · PLN 9.4 billion

Tap a region (or hover) to see its breakdown.

Circle colour is the field with the most projects in the voivodeship:TransportEnergytie (several fields with the same count)Industry

430 projects on the map; circle size = number of projects in the voivodeship (not value). Regional counts add up to more than 430 because 67 projects span several voivodeships. The same applies to the amounts: a multi-region project enters each of them at full value, so the regional figures must not be added up – they come to about 44% more than those records do. 25 sensitive sites are counted at voivodeship level (no precise point). 32 projects have no assigned region – off the map.

VoivodeshipProjectsValue (bn PLN)Main fields
Mazowieckie105 ·7403TransportEnergyDefence
Pomorskie70 ·6443TransportEnergyDefence
Śląskie45110TransportIndustryEnergy
Dolnośląskie42 ·2177IndustryTransportEnergy
Małopolskie35 ·180.3TransportEnergyEnvironment
Wielkopolskie33 ·4148TransportEnergyDefence
Podkarpackie30 ·474.4TransportDefenceEnergy
Łódzkie29 ·2129TransportEnergyDefence
Zachodniopomorskie29 ·174.9TransportEnergyEnvironment
Kujawsko-pomorskie25 ·161.5EnergyTransportDefence
Lubelskie22 ·255.9TransportEnergyDefence
Warmińsko-mazurskie19 ·166.9TransportEnergyDigital
Podlaskie15 ·252.0EnergyTransportDefence
Świętokrzyskie13 ·113.9TransportDefenceEnergy
Lubuskie13 ·19.4TransportEnergyIndustry
Opolskie817.6EnergyIndustryHealth

The number after the dot (e.g. “105 ·7”) is how many of the voivodeship’s projects are sensitive sites. They are counted at voivodeship level, with no precise point.

Voivodeship geometry: ppatrzyk/polska-geojson, CC0 licence. Project data: Projektometr’s own database, sources on each project.