What changed
Between two snapshots.
We record the registry as dated snapshots, and a file once written is never changed. This page subtracts one from the other: between 2026-09-01 and 2026-09-09, 6 fields changed across 6 records.
What this page does not show
A snapshot records five fields: status, stage, cost, cost currency and current delivery date. A change to a description, a source or a quote leaves no trace here, because the snapshot does not record it. Fixes that changed what the site asserts are listed separately.
| Record | Field | Was | Is now |
|---|---|---|---|
| Central Integrated Clinical Hospital in Poznań | stage | construction | commissioning |
| LG Energy Solution Wrocław battery gigafactory (Biskupice Podgórne) – expansions | stage | commissioning | operational |
| Veolia Nowa Energia Energy Recovery Plant (ITPO) in Łódź (EC4) | cost (mn) | 1,000 | 1,855.725 |
| Modernization of the Świnoujście–Szczecin fairway to 12.5 m | cost (mn) | 1,900 | 1,963.75 |
| Baltica 3 offshore wind farm | current date | 2030 | no value |
| Tram to Mistrzejowice – KST Stage IV (Krakow, PPP) | current date | Aug 2026 | Sep 2026 |
Records that are gone
2 – usually merged duplicates. We never rewrite a snapshot, so the older one still counts them.
- modernisation-deepening-of-the-swinoujscie-szczecin-fairway-to-12-5-m
- poland-lithuania-gas-interconnector-gipl