What changed

Between two snapshots.

We record the registry as dated snapshots, and a file once written is never changed. This page subtracts one from the other: between 2026-09-01 and 2026-09-09, 6 fields changed across 6 records.

What this page does not show

A snapshot records five fields: status, stage, cost, cost currency and current delivery date. A change to a description, a source or a quote leaves no trace here, because the snapshot does not record it. Fixes that changed what the site asserts are listed separately.

See the corrections →

Records that are gone

2 – usually merged duplicates. We never rewrite a snapshot, so the older one still counts them.

  • modernisation-deepening-of-the-swinoujscie-szczecin-fairway-to-12-5-m
  • poland-lithuania-gas-interconnector-gipl