Poznań Fast Tram (PST), northern trunk (“Pestka”)

completedstage: operationaldelivered
funding: state funds

The Poznań Fast Tram (PST), colloquially known as “Pestka”, was the first premetro-type fast tram line in Poland: a fully segregated, grade-separated track running from the city centre (Most Teatralny) to the northern district of Piątkowo (Jana III Sobieskiego estate). The original northern-trunk corridor was approximately 6.1 km long with 6 stops. The preparatory phase began in 1980, and actual construction started in 1982; owing to a lack of funding, the works progressed very slowly and took more than ten years in total. The inaugural tram ran on the route on 30 January 1997, and on 1 February 1997 regular daily service began on three lines. The general designer was a team led by Dr Eng. Zygmunt Nowak (Poznańskie Biuro Projektów Dróg i Mostów, Transprojekt), and a total of 86 contractors worked on the construction. The route is operated by the Miejskie Przedsiębiorstwo Komunikacyjne w Poznaniu (MPK Poznań, the Poznań municipal transport company). In 2013 the route was extended by a section to Dworzec Zachodni (outside the scope of this record, which covers the 1997 northern trunk).

How it went

Assessment: settled, as of 25 Jul 2026. This is our reading, not a verdict, and we show it only where a quote from a source listed below stands behind it. Of the four, 2 carry no assessment yet. How to read this section

Deliverydelivered[1]
Utilisationin use[1]

A “wiki” mark means the value stands on Wikipedia alone. Our count of independent sources treats it as zero, so read such a place as less firmly documented than the rest of the card – that applies to an outcome row, a figure, a date and a status alike.

eksploatacja trasy szybkiego tramwaju
Current
trasa czynna, obsługiwana przez MPK Poznań; kluczowe znaczenie dla komunikacji w północnej części miasta (2026)

Timeline

  1. Construction start1982
  2. Delivery1 Feb 1997

Change history

  • 1 Feb 1997status: completed1 lutego 1997 roku rozpoczęto regularne kursy po trasie północnej PST (3 linie dzienne); inauguracyjny przejazd 30 stycznia 1997 roku.
  • 1 Feb 1997stage: operational
  • 1982stage: construction

Significance

The Poznań Fast Tram was the first line of this type (premetro) in Poland: a compromise between a metro and a conventional tram, with a fully segregated, grade-separated track. The route is of central importance to transport in the centre and northern part of Poznań, connecting the densely populated Piątkowo district with the city centre. It became a model example in the country of urban rail transport with parameters close to those of a light metro.

Sources 5 · 4 independent · 4 archived

Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.

Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.

A “wiki” mark means the value stands on Wikipedia alone. Our count of independent sources treats it as zero, so read such a place as less firmly documented than the rest of the card – that applies to an outcome row, a figure, a date and a status alike.

  1. Wikipedia (pl)
    StatusStageDeliveryInvestorFundingUtilisation
    Status · Delivery1 lutego 1997 regularne kursy po trasie PST rozpoczęły 3 linie dzienne
    Stage · Investor · UtilisationObsługiwana jest przez Miejskie Przedsiębiorstwo Komunikacyjne.
    FundingBudowa początkowo była finansowo ukrywana przed władzami centralnymi (przez dwa pierwsze lata nie było zgody na tę inwestycję), a pieniądze przesuwano z budżetu wojewody przeznaczonego na remonty kapitalne dróg i mostów
  2. mapa-metro.com
  3. Miasto Poznań2022
  4. Portal Komunalny2017
    Construction start
    Construction startW 1982 roku ruszyła budowa pierwszej tego typu trasy w Polsce.
  5. Codzienny Poznań1 Feb 2026