S8 Expressway Wrocław (Magnice) – Kłodzko

under constructionstage: construction

Construction of the S8 expressway from Wrocław (Magnice) to Kłodzko in the Kłodzko Valley, carried out by GDDKiA. The entire corridor has been divided into seven sections, of which – as of June 2026 – six are already under construction, while the final Bardo–Kłodzko fragment remains at the preparation stage (technical, economic and environmental study). The individual sections are to be opened to traffic, depending on the fragment, in the years 2028–2033. The route is being built under the "Design and build" system as a dual carriageway with two lanes in each direction and hard shoulders.

How it went

We have assessed this project, but none of the four axes is shown here: 3 carry no assessment yet, one has an assessment with no confirmed quote. The timeline and sources below show what is known about it. How to read this section

Timeline

  1. Current date2033

Significance

The investment completes the expressway connection of Wrocław with the Kłodzko Valley and the southern part of Lower Silesia, improving the transport accessibility of the region and shortening travel towards the border crossings with the Czech Republic. Spreading the implementation over seven sections opened in stages up to 2033 makes this route one of the largest and longest-running road undertakings in Lower Silesia.

Sources 4 · 3 independent · 1 archived

Every fact on this card comes from the sources below. Next to each source – which fields it supports.

Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.

  1. Generalna Dyrekcja Dróg Krajowych i Autostrad (gov.pl)
    Current dateFunding
    Current date · LocationZakończenie budowy drogi ekspresowej S8 Wrocław – Kłodzko i oddanie trasy do ruchu planowane jest (w zależności od odcinka) w latach 2028-2033.
    FundingRealizacja S8 od Wrocławia przez Kłodzko do Boboszowa jest wpisana do Rządowego Programu Budowy Dróg Krajowych i Autostrad do roku 2030 (z perspektywą do 2033 r.).
  2. GDDKiA – Oddział we Wrocławiu (gov.pl)9 Jun 2026
    StatusStage
    Status · StageRealizacja drogi podzielona została na siedem odcinków. Sześć z nich jest już w realizacji.
  3. Wroclaw.pl
    Investor
    NameBlisko 380 mln zł przeznaczono na budowę kolejnego odcinka drogi ekspresowej S8 Wrocław-Kłodzko.
    InvestorBudowę ponad 64-kilometrowego odcinka S8 z Wrocławia do Barda inwestor: Generalna Dyrekcja Dróg Krajowych i Autostrad, podzielił na sześć fragmentów.
  4. Budimex