Design and construction of a section of the S16 expressway between Borki Wielkie and Mrągowo: about 13 km of dual carriageway and about 3 km of single-carriageway Mrągowo bypass on national roads 16 and 59. The contract with PORR SA, worth PLN 625.9 million, was signed by the GDDKiA Olsztyn branch on 28 May 2020. The road opened to traffic on 13 August 2024. It has two interchanges (Sorkwity and Bagienice) and a rest area at Marcinkowo. The contract value was later amended for indexation and additional works.
How it went
No outcome assessment on this card. This is not a fault: we show an assessment only where a source quote stands behind it. Of the four axes, 2 carry no assessment yet, 2 have an assessment with no confirmed quote. The timeline and sources below show what is known about the project. How to read this section
Timeline
- Delivery13 Aug 2024
Significance
The section extends the dual carriageway between Biskupiec and Borki Wielkie, opened in 2014, and takes transit traffic out of built-up Mrągowo. Four large-animal crossings and noise barriers were built.
Sources 4 · 4 independent
Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.
Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.
- TKO Twój Kurier Olsztyński28 May 2020CostInvestor
CostZadanie to zrealizuje firma PORR SA za 625,9 mln zł.
InvestorOlsztyński oddział Generalnej Dyrekcji Dróg Krajowych i Autostrad podpisał w czwartek umowę na projekt i budowę drogi ekspresowej S16 na odcinku Borki Wielkie – Mrągowo.
- GDDKiA Oddział w Olsztynie13 Aug 2024StatusStage
Status · StageMożna już korzystać z odcinka drogi ekspresowej położonego na granicy Warmii i Mazur.
- NBI13 Aug 2024Delivery
DeliveryOd 13 sierpnia 2024 roku kierowcy mogą korzystać z drogi ekspresowej S16 Borki Wielkie – Mrągowo.
- Rynek Infrastruktury13 Aug 2024