Silesian Canal

plannedstage: announced
PLN 11 billion
estimate · data from 2019net or gross: not recorded≈ PLN 11 billion (value-by-stage, est., nominal)Limitations: the amount recorded at the current stage, nominal, not adjusted for inflation. The total cost of the project may differ.

The Silesian Canal is a planned inland waterway approximately 93 km long, intended to connect the Odra (near Kędzierzyn-Koźle) with the Vistula (near Oświęcim) and link the Upper Silesian Industrial Region and the Rybnik Coal Region with the Odra corridor and Krakow. The route would pass through Kuźnia Raciborska, Rybnik, Żory, Tychy and Bieruń. The concept dates back to the 18th century, and the southern variant was selected as early as 1973; nonetheless, the undertaking remains at the conceptual and planning stage. The applicable National Waterway Program until 2030 lists the canal as a planned connection, with the prospect of implementation only after 2030. The estimated construction cost was put at approximately PLN 11 billion.

How it went

No outcome assessment: this record carries none on any of the four axes yet. The timeline and sources below show what is known about it; the assessment itself has not been made.

Change history

  • Sep 2025status: plannedIncluded in the National Shipping Programme until 2030 as a connection planned with a horizon beyond 2030.
  • Oct 2019stage: announced

Significance

The canal would create a navigable, class IV connection between the Odra and Vistula basins, handling pushed convoys with a load capacity of up to 3,500 t; approximately 10 locks measuring 190×12×4 m were planned. For the region, it would mean an alternative waterway route for transporting bulk cargo from Silesia toward the ports of Szczecin and Świnoujście, as well as closing a segment of the European waterway corridor. The scale of costs (on the order of PLN 11 billion) and the multi-year horizon, pushed beyond 2030, make implementation uncertain.

Sources 6 · 5 independent · 4 archived

Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.

Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.

  1. money.pl
  2. Wikipedia
    Description
    Descriptionok. 93 km
    DescriptionZ Wisłą ma łączyć się w okolicach Oświęcimia, a z Odrą w rejonie Kędzierzyna-Koźla
  3. naszraciborz.pl (za Rzeczpospolita)30 Oct 2019
  4. Seaoo.com7 Nov 2019
    Cost
    CostKoszt całego przedsięwzięcia to około 11 miliardów złotych
    LocationKanał Śląski będzie przebiegał przy Kuźni Raciborskiej, Rybnika, Żor, Tychów i Bierunia
  5. zegluga-rzeczna.pl
    Significance
    SignificanceŚluzy o wymiarach 190x12x4 m pozwalałyby na żeglugę zestawami pchanymi o ładowności 3500 ton przy zanurzeniu 2,4 m.
    SignificanceKanał miał odpowiadać parametrom klasy IV drogi wodnej.
  6. Radio Eska Śląskie26 Sep 2025
    StatusStage
    StatusObecnie obowiązujący Krajowy Program Żeglugowy do roku 2030 uwzględnia Kanał Śląski, ale jako planowane połączenie z perspektywą... po 2030 roku
    Stageuwzględnia Kanał Śląski, ale jako planowane połączenie z perspektywą... po 2030 roku