🚆Transportstrategic

Modernization of the E30 railway line Katowice – Krakow

under constructionstage: construction
PLN 2.0 billion
programme budget (multi-year) · data from 2021net or gross: not recorded≈ PLN 2.0 billion (value-by-stage, est., nominal)funding: EU funds, state fundsLimitations: the amount recorded at the current stage, nominal, not adjusted for inflation. The total cost of the project may differ.

A phased modernization of the international E30 railway line on the Katowice–Krakow section (over 58 km), carried out by PKP Polskie Linie Kolejowe S.A. and co-financed from the EU's CEF "Connecting Europe" instrument. The investment, worth more than PLN 2 billion, covered the reconstruction of tracks, stations and stops as well as dozens of engineering structures: a total of 34 railway and road viaducts are being built along the route, of which 10 in new locations and 24 thoroughly rebuilt. The works were originally planned to be completed in 2014, but the investment, carried out in sections, struggled with years of delays, and the construction works and implementation of the traffic control system dragged on into subsequent years.

How it went

No outcome assessment on this card. This is not a fault: we show an assessment only where a source quote stands behind it. Of the four axes, 3 carry no assessment yet, one has an assessment with no confirmed quote. The timeline and sources below show what is known about the project. How to read this section

Timeline

  1. Original date2014

Change history

  • Nov 2021stage: construction

Significance

The modernization shortened the travel time between Katowice and Krakow by about 42 minutes ("three quarters of an hour"), enabling passenger trains to run at speeds up to 160 km/h and freight trains up to 120 km/h. The reconstruction of dozens of viaducts and the building of grade-separated crossings improved safety on the route. The line is a strategic connection between Silesia and Lesser Poland and an element of the rail corridor linking Poland with Western Europe.

Sources 6 · 5 independent · 6 archived

Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.

Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.

  1. PKP Polskie Linie Kolejowe S.A.19 Mar 2012
    Original dateSignificanceDescription
    Original dateZakończenie robót, prowadzonych w systemie „projektuj i buduj”, planowane jest na czerwiec 2014 r.
    Location · SignificanceModernizacja linii E30 na odcinku Sosnowiec Jęzor – Kraków Towarowy skróci podróż między Katowicami a Krakowem o 42 minuty.
    DescriptionPrzewidywany koszt modernizacji linii liczącej ponad 58 km to około 1,4 mld zł netto.
  2. Śląski Biznes25 Jan 2019
    SignificanceDescriptionStage
    Significancepociągi pasażerskie na tej trasie przyspieszą do 160 km/h, a towarowe do 120 km/h.
    DescriptionProjekt jest dofinansowany ze środków Unii Europejskiej w ramach programu CEF Łącząc Europę.
    DescriptionŁącznie na linii kolejowej E30, pomiędzy Krakowem i Katowicami, PLK realizuje aktualnie 34 wiadukty kolejowe i drogowe. 10 z nich budowanych jest w nowych miejscach, pozostałe 24 to gruntownie modernizowane obiekty.
    Stage10 z nich budowanych jest w nowych miejscach, pozostałe 24 to gruntownie modernizowane obiekty.
    StageŁącznie na linii kolejowej E30, pomiędzy Krakowem i Katowicami, PLK realizuje aktualnie 34 wiadukty kolejowe i drogowe.
  3. PKP Polskie Linie Kolejowe S.A.10 Nov 2021
    StatusCostStage history
    Status · Stage historyPKP Polskie Linie Kolejowe S.A. podpisały umowy za 68 mln zł na budowę trzech wiaduktów i przejścia podziemnego.
    CostModernizacja linii kolejowej E30 na odcinku Kraków Katowice to inwestycja warta przeszło 2 mld zł.
  4. Inżynieria.com16 Jun 2020
    Investor
    InvestorPKP Polskie Linie Kolejowe S.A. (PKP PLK) kończą modernizację krakowskiego odcinka linii E30 w kierunku Katowic.
  5. Rynek Kolejowy19 Feb 2019
  6. PKP Polskie Linie Kolejowe S.A. (Mapa inwestycyjna)28 Oct 2024
    Funding
    FundingWARTOŚĆ DOFINANSOWANIA Z UNII EUROPEJSKIEJ * 324 334 746,12 EUR
    FundingWARTOŚĆ DOFINANSOWANIA Z BUDŻETU PAŃSTWA ** 192 181 739,60 PLN