Field
Digital in Poland
21 strategic investments in this field. In progress: 8, completed: 12. The strip below carries the full split by status and the value-by-stage figure. The list is ordered by momentum, so whatever is closest to opening comes first, and each record carries a link to its source.
19 of 21 records enter the sum: those with a stated cost, excluding parent programmes (so they are not counted alongside their sub-projects), cancelled records and foreign purchases. Amounts are nominal, in prices from various years, with no inflation adjustment; those recorded in a foreign currency are converted at a fixed rate of EUR 4.30 / USD 4.00 / SEK 0.38. An inventory for comparison, not a ledger of state spending.
Projects in this field
Ordered by momentum: build stage and proximity to opening. Each row carries the status, the opening year and the source count.
- NRRP C1.1.1 – high-speed internet in white-spot areasPLN 2.5 billion
- Cyber-Secure Local Government (and the FERC/KPO continuation)PLN 1.5 billion
- Google Cloud Warsaw RegionPLN 8.0 billion
- Digital Poland Operational Programme – Priority Axis I (broadband networks, measure 1.1)PLN 4.3 billion
- Microsoft Azure Poland Central cloud regionPLN 4.0 billion
- Regional Broadband Networks (RSS) – Regional Operational Programmes 2007–2013PLN 3.0 billion
- Data4 Data Center Campus in Jawczyce near WarsawPLN 2.6 billion
- Atman Data Center Warsaw-3 (WAW-3) Campus in DuchnicePLN 2.5 billion
- Eastern Poland Broadband Network (SSPW)PLN 1.3 billion
- viaTOLL electronic toll system (Kapsch, 2011)PLN 0.96 billion
- e-Taxes / e-Declarations (Ministry of Finance IT projects programme, POIG Priority Axis 7, 2007–2015)PLN 0.90 billion
- Electronic Platform for Collecting, Analysing and Sharing Digital Resources on Medical Events (P1, e-Health)PLN 0.71 billion
- pl.ID - the Polish ID Card (electronic identity document)PLN 0.51 billion
- Internet for Masovia (Regional Broadband Network of the Masovian Voivodeship)PLN 0.46 billion
- Wielkopolska Broadband Network (WSS)PLN 0.41 billion
- National Educational Network (OSE)PLN 0.32 billion
- Central Register of Vehicles and Drivers (CEPiK 2.0)PLN 0.15 billion
- National Teleinformatics Network for Emergency Number 112 (OST 112)PLN 0.15 billion
- Vantage WAW1 Data Center Campus in Warsawn/a
- DL Invest and Boosteroid data center, Bielsko-BiałaPLN 4.0 billion
- Expansion of Microsoft's Cloud and AI Infrastructure in PolandPLN 2.8 billion
All fields
The same catalogue, a different cut of it. Every record belongs to exactly one field, so these counts add up to the whole database.