Field

Industry in Poland

56 strategic investments in this field. In progress: 12, completed: 33. The strip below carries the full split by status and the value-by-stage figure. The list is ordered by momentum, so whatever is closest to opening comes first, and each record carries a link to its source.

56projects in the database
PLN 152 billionvalue-by-stage (nominal, est.)
12in progress
33completed
2planned
8cancelled
1superseded

45 of 56 records enter the sum: those with a stated cost, excluding parent programmes (so they are not counted alongside their sub-projects), cancelled records and foreign purchases. Amounts are nominal, in prices from various years, with no inflation adjustment; those recorded in a foreign currency are converted at a fixed rate of EUR 4.30 / USD 4.00 / SEK 0.38. An inventory for comparison, not a ledger of state spending.

Projects in this field

Ordered by momentum: build stage and proximity to opening. Each row carries the status, the opening year and the source count.

  1. Polimery Police (PDH and polypropylene installation)PLN 7.2 billionunder constructionin the home stretch2027about 8 years late10 src.
  2. IONWAY cathode materials plant (Umicore + PowerCo/VW) in NysaPLN 7.3 billionunder construction20266 src.
  3. Mercedes-Benz electric van factory (VAN.EA) in JaworPLN 4.3 billionunder construction20266 src.
  4. HBO Project – Hydrocracking Oil Block at the Gdańsk RefineryPLN 1.8 billionunder construction20265 src.
  5. Second-Generation Bioethanol Complex in Jedlicze (Orlen Południe)PLN 1.1 billionunder construction2027about 3 years late5 src.
  6. SK Nexilis copper foil factory in Stalowa WolaPLN 3.0 billionunder constructionin the home stretch11 src.
  7. Orlen Olefiny III (original scope)PLN 51 billionsuperseded9 src.
  8. Olefins III / Nowa Chemia (petrochemical complex in Płock)PLN 36 billionunder construction2030about 6 years late8 src.
  9. LG Energy Solution Wrocław battery gigafactory (Biskupice Podgórne) – expansionsPLN 14 billionoperating, being expanded8 src.
  10. Głogów Głęboki-Przemysłowy (deposit access program, shafts GG-1/GG-2/Retków)PLN 9.0 billionunder construction6 src.
  11. Program 10+ (expansion of the Grupa LOTOS refinery in Gdańsk)PLN 5.5 billioncompleted20119 src.
  12. PX/PTA Complex – Paraxylene Plant (Płock) and Terephthalic Acid Plant (Włocławek), PKN OrlenPLN 4.1 billioncompleted20117 src.
  13. Daewoo-FSO Motor car plant at Żeran (Warsaw)PLN 3.7 billioncompleted19965 src.
  14. Volkswagen Crafter factory in WrześniaPLN 3.4 billioncompleted20169 src.
  15. Bzie-Dębina coking coal mine (JSW)PLN 3.0 billionoperating, being expanded6 src.
  16. Mercedes-Benz engine and battery plant in JaworPLN 2.6 billioncompleted20197 src.
  17. Pyrometallurgy Modernisation Programme – flash furnace at the Głogów Copper SmelterPLN 2.5 billioncompleted2017about 2 years late8 src.
  18. Fiat Auto Poland Tychy: new Panda lines (2003)PLN 2.5 billioncompleted20033 src.
  19. Toyota hybrid powertrain programme (Wałbrzych, Jelcz)PLN 2.3 billioncompleted20223 src.
  20. EFRA Project (Effective Refining) – Delayed Coking Complex, Grupa LOTOS Refinery in GdańskPLN 2.3 billioncompleted2019about 2 years late6 src.
  21. Toyota Motor Manufacturing Poland – engine and gearbox plant in WałbrzychPLN 2.1 billioncompleted20025 src.
  22. Basell Orlen Polyolefins – Polypropylene and Polyethylene Plants in PłockPLN 2.0 billioncompleted20055 src.
  23. LG cluster in Kobierzyce/Biskupice Podgórne (LG.Philips LCD / LG Display, LG Electronics)PLN 1.7 billioncompleted20077 src.
  24. Lubiatów–Międzychód–Grotów (LMG) oil and gas field, PGNiGPLN 1.7 billioncompleted20135 src.
  25. Expansion of Fertiliser Production Capacity at Anwil (Włocławek)PLN 1.7 billioncompleted2023about 2 years late7 src.
  26. Fiat-GM Powertrain / FCA Powertrain engine plant in Bielsko-Biała (1.3 MultiJet)PLN 1.6 billioncompleted20035 src.
  27. Mondi Świecie – New MP7 Paper Machine and Packaging LinePLN 1.5 billioncompleted20096 src.
  28. New ArcelorMittal Poland Hot Rolling Mill in Kraków (former Sendzimir Steelworks)PLN 1.2 billioncompleted20076 src.
  29. PepsiCo (Frito-Lay) plant in Święte near Środa ŚląskaPLN 1.0 billioncompleted20236 src.
  30. Expansion of the Żelazny Most Mining Waste Disposal Facility – Southern QuarterPLN 1.0 billioncompleted20217 src.
  31. Opel / General Motors Manufacturing Poland Car Plant in GliwicePLN 0.97 billioncompleted19984 src.
  32. Volkswagen Motor Polska – Diesel Engine Plant in PolkowicePLN 0.92 billioncompleted19995 src.
  33. Cadbury / Cadbury Wedel (Mondelēz) Chocolate and Chewing Gum Factory in SkarbimierzPLN 0.87 billioncompleted20106 src.
  34. Northvolt battery systems plant in Gdańsk (Northvolt Dwa)PLN 0.80 billioncompleted202310 src.
  35. HVO plant in Płock (hydrotreatment of vegetable oils)PLN 0.80 billioncompletedfreshly completed20267 src.
  36. Isuzu Motors Polska (ISPOL) Diesel Engine Plant in TychyPLN 0.77 billioncompleted19996 src.
  37. Dell computer factory in Łódź (Olechów)PLN 0.76 billioncompleted20077 src.
  38. Visbreaking unit at the Płock production facilityPLN 0.75 billioncompletedfreshly completed2025about 2 years late9 src.
  39. ArcelorMittal: blast furnace no. 2 overhaul (Dąbrowa)PLN 0.72 billioncompleted20233 src.
  40. Sharp LCD module factory in Łysomice near Toruń (Sharp Manufacturing Poland, Pomorska SEZ Ostaszewo)PLN 0.60 billioncompleted20074 src.
  41. Diesel Hydrodesulphurisation Unit HON VII (PKN Orlen, Płock)PLN 0.50 billioncompleted20104 src.
  42. Michelin Group investments in the tyre factory in Olsztyn (former Stomil Olsztyn)PLN 0.41 billioncompleted19966 src.
  43. MAN Truck & Bus heavy truck factory in NiepołomicePLN 0.38 billioncompleted20073 src.
  44. Umicore cathode materials plant in Nysan/acompleted2022about 2 years late8 src.
  45. KGHM PUCK polyhalite mine (Mieroszyno deposit)PLN 7.0 billionplanned4 src.
  46. Electric car factory in Jaworzno (formerly Izera / ElectroMobility Poland)PLN 4.5 billionplanned20295 src.
  47. Jan Karski coal mine (Lublin Coal Basin)PLN 2.5 billioncancelled3 src.
  48. HyperPIC – VIGO Photonics photonic integrated circuit factoryPLN 1.0 billionin preparation20305 src.
  49. Gubin-Brody Complex (Lignite Mine and Power Plant)n/acancelled6 src.
  50. Złoczew Open-Pit Mine (lignite for Bełchatów)n/acancelled8 src.
  51. Intel semiconductor assembly and test factory near Wrocław (Miękinia)PLN 18 billioncancelled8 src.
  52. Hard coal mine phase-out programme (social agreement)PLN 11 billionin progress20496 src.
  53. Gdynia Shipyard restructuring and aid (2004–2008)PLN 2.1 billioncancelled4 src.
  54. Szczecin Nowa Shipyard restructuring (2004-2008)PLN 0.71 billioncancelled4 src.
  55. Izera / ElectroMobility Poland (Polish electric car)PLN 0.58 billioncancelledabout 2 years late9 src.
  56. Saule Technologies (commercialization of perovskite solar cells)n/acancelled10 src.

All fields

The same catalogue, a different cut of it. Every record belongs to exactly one field, so these counts add up to the whole database.