Toyota hybrid powertrain programme (Wałbrzych, Jelcz)

completedstage: operational
PLN 2.3 billion
estimate · data from 19 Dec 2022net or gross: not recorded≈ PLN 2.3 billion (value-by-stage, est., nominal)Sum of project costs from the table in Toyota's release of 19 December 2022. The row for the second 1.5 l engine line (December 2021) carries no amount in the table. The amount is the sum of project values from Toyota's table, not a contract value.Limitations: the amount recorded at the current stage, nominal, not adjusted for inflation. The total cost of the project may differ.

A series of Toyota Motor Manufacturing Poland investments in hybrid powertrains at the plants in Wałbrzych and Jelcz-Laskowice. The first, an electric hybrid transmission for 1.8 l engines, started in Wałbrzych in 2018. TNGA 2.0 l and 1.5 l engines in Jelcz-Laskowice and transmissions for the 1.5 l engine followed. The last, a fifth-generation transmission with MG1 and MG2 electric motors, started in December 2022. Toyota puts the combined value of these projects at PLN 2.308 billion.

How it went

No outcome assessment on this card. This is not a fault: we show an assessment only where a source quote stands behind it. Of the four axes, 3 carry no assessment yet, one has an assessment with no confirmed quote. The timeline and sources below show what is known about the project. How to read this section

Timeline

  1. Construction start2018
  2. DeliveryDec 2022

Significance

The plants in Wałbrzych and Jelcz-Laskowice form Toyota's European hybrid powertrain centre. Poland is the only country in Europe where Toyota makes electric hybrid transmissions. Hybrid drives account for 70 per cent of TMMP output, and the two plants employ 3,400 people. In fifth-generation transmissions, 78 per cent of parts come from Europe.

Sources 3 · 3 independent

Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.

Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.

  1. Toyota Motor Manufacturing Poland19 Dec 2022
    StatusStageCostConstruction startDeliveryInvestorSignificanceDescription
    Status · StageW fabrykach w Wałbrzychu i Jelczu-Laskowicach funkcjonuje łącznie aż sześć linii produkcyjnych głównych podzespołów hybrydowych
    Costgrudzień 2022 RAZEM 992 tys. 2,308 mld PLN
    Construction startNowe przekładnie hybrydowe zastąpią produkowane od 2018 roku w wałbrzyskiej fabryce Toyoty przekładnie czwartej generacji.
    Delivery19 grudnia 2022 Toyota uruchomiła w Polsce produkcję napędów hybrydowych piątej generacji.
    InvestorToyota Motor Manufacturing Poland (TMMP) rozpoczęła produkcję elektrycznych przekładni hybrydowych piątej generacji
    SignificancePolska to jedyny kraj w Europie, w którym Toyota wytwarza elektryczne przekładnie hybrydowe.
    SignificanceUdział napędów hybrydowych w całkowitej produkcji TMMP wynosi obecnie 70%.
    Significanceudział europejskich części przy produkcji przekładni piątej generacji wynosi 78%
    Descriptionczyniąc je, wraz z następującymi po nich projektami, europejskim centrum napędów hybrydowych Toyoty
    SignificanceW obu zakładach pracuje łącznie 3400 osób.
  2. Polska Agencja Inwestycji i Handlu17 Dec 2021
    Description
    DescriptionToyota wybudowała całkowicie nową halę produkcyjną silnika TNGA o powierzchni 13 tysięcy metrów kwadratowych.
  3. Wałbrzyszek.com30 Oct 2018
    Construction start
    Construction startW wałbrzyskiej fabryce Toyoty ruszyła produkcja przekładni hybrydowych.