Głogów Głęboki-Przemysłowy (deposit access program, shafts GG-1/GG-2/Retków)

under constructionstage: construction
PLN 9.0 billion
programme budget (multi-year) · data from 2025net or gross: not recorded≈ PLN 9.0 billion (value-by-stage, est., nominal)Limitations: the amount recorded at the current stage, nominal, not adjusted for inflation. The total cost of the project may differ.

The deposit access program in the Głogów Głęboki-Przemysłowy (GG-P) mining area comprises the construction of new KGHM Polska Miedź mining shafts: the GG-1 ventilation shaft in Kwielice (Grębocice commune) and the priority downcast shafts serving material-handling and personnel-descent functions – GG-2 (Odra) in the Słone area (Żukowice commune), Retków (Grębocice commune) and Gaworzyce. The GG-P deposit holds nearly 227 million tonnes of copper ore with an average grade of about 2.48% Cu, lying at depths reaching about 1,385 m, corresponding to roughly one-fifth of KGHM's copper reserves in Polish concession areas. The GG-1 shaft reached a depth of 1,348 m and in 2023 connected with the workings of the ZG Rudna mine, with completion of its surface works expected in 2029. KGHM estimates the total outlay for the three priority shafts (GG-2 Odra, Retków and Gaworzyce) at PLN 7.5–9 billion. It is the largest deposit-access investment in European non-ferrous metal ore mining.

How it went

No outcome assessment on this card. This is not a fault: we show an assessment only where a source quote stands behind it. Of the four axes, 3 carry no assessment yet, one has an assessment with no confirmed quote. The timeline and sources below show what is known about the project. How to read this section

Significance

Access to the GG-P deposit is crucial for maintaining and increasing domestic copper output. In the peak production period (estimated at 2028–2035), the area is to deliver 10–11 million tonnes of ore and about 200,000–220,000 tonnes of electrolytic copper per year and sustain the planned production level for 20–30 years. The new shafts provide access to the deepest, industrial portions of the deposit, underpinning Poland's long-term raw-material security and the maintenance of jobs in the Copper Basin in Lower Silesia.

Sources 6 · 5 independent · 5 archived

Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.

Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.

  1. KGHM Polska Miedź S.A.
    Investor
    InvestorThe investment project is 100% owned by KGHM.
  2. Parkiet20 Mar 2025
    CostStage
    CostSzyby górnicze GG-2, Retków i Gaworzyce mogą łącznie kosztować 7,5–9 mld zł.
    StageTrwa też budowa obiektów powierzchniowych.
  3. Parkiet5 Mar 2026
    Status
    StatusStopniowo rośnie wydobycie KGHM-u z kluczowego obszaru górniczego
  4. MyGłogów19 Nov 2024
  5. Mindat.org
    LocationGG-1 shaft (Głogów Głęboki-Przemysłowy mine), Kwielice, Gmina Grębocice, Polkowice County, Lower Silesian Voivodeship, Poland