Mondi Świecie – New MP7 Paper Machine and Packaging Line
The construction of the seventh paper machine (MP7) at the Mondi Świecie S.A. plant in Świecie (Kuyavian-Pomeranian Voivodeship), together with a new production line for corrugated case materials, was the largest investment in the plant's history. The investment cost was approximately EUR 350 million. MP7 is a line producing lightweight recycled paper (fluting and testliner with a basis weight of 75 to 140 g/m2) with a target output of 470,000 tonnes per year and a design speed of 1,800 m/min. It is one of the fastest packaging paper machines in the world. Construction took approximately 16 months; more than 1,500 people took part in the works, and the new machine was started up in 2009. The new technology reduced steam consumption by approximately 20%, electricity consumption by approximately 30%, and water consumption by approximately 40% per tonne of paper. Mondi Group owns 100% of the share capital of Mondi Świecie S.A.
How it went
Assessment: settled, as of 25 Jul 2026. This is our reading, not a verdict, and we show it only where a quote from a source listed below stands behind it. Of the four, one carries no assessment yet, one has an assessment with no confirmed quote. How to read this section
- Capacity or target
- 470 000 ton papieru rocznie (rocznie (docelowo))
Timeline
- Delivery2009
Significance
MP7 was the largest investment in the history of the Mondi Świecie plant and one of the most modern packaging paper production lines in the world. The new machine, with a target output of 470,000 tonnes of paper for corrugated board per year, significantly increased the production capacity of the plant in Świecie and strengthened its position as one of the largest packaging paper producers in this part of Europe, while lowering unit consumption of steam, electricity, and water.
Sources 6 · 4 independent · 6 archived
Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.
Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.
A “wiki” mark means the value stands on Wikipedia alone. Our count of independent sources treats it as zero, so read such a place as less firmly documented than the rest of the card – that applies to an outcome row, a figure, a date and a status alike.
- Wikipedia (pl)CostInvestor
CostW 2009 podjęto największą w historii zakładu inwestycję (350 mln euro), polegającą na zainstalowaniu nowego ciągu technologicznego produkcji tektury i opakowań
InvestorWłaścicielem 100% kapitału zakładowego spółki jest grupa Mondi
- drewno.pl3 Nov 2010
- drewno.pl8 Sep 2009StatusStageDelivery
Status · Stage · DeliveryZarząd Mondi Świecie SA poinformował o dokonaniu rozruchu nowej maszyny papierniczej.
- [4]MP7 - nowa, szybkobieżna maszyna papiernicza w Świeciu (Przegląd Papierniczy, R. 64, nr 10, 2008) ↗archived ✓Przegląd Papierniczy / BazTech2008
- Utilisation
UtilisationWe started to produce marketable quality within a few days. The paper quality was according to the standard accepted by our customers.