Toyota Motor Manufacturing Poland – engine and gearbox plant in Wałbrzych

completedstage: operationaldelivered
PLN 2.1 billion
estimate · data from 2002net or gross: not recorded≈ PLN 2.1 billion (value-by-stage, est., nominal)funding: private finance, state fundsThe source gives EUR 540 million. The zloty figure is our conversion at the rate for 2002, so the site fixed rate will not reproduce it.Limitations: the amount recorded at the current stage, nominal, not adjusted for inflation. The total cost of the project may differ.

The Toyota Motor Manufacturing Poland (TMMP) plant in Wałbrzych is a greenfield investment by the Japanese Toyota group, and is Toyota's largest components-production centre outside Japan. TMMP was established in 1999, and production started on 10 April 2002, initially of 5-speed manual gearboxes, and subsequently also of petrol engines. The value of the initial investment in the Wałbrzych plant was approximately EUR 540 million. The plant occupies an area of approximately 500,000 m² (built-up area approximately 100,000 m²), and its production capacity covers 720,000 gearboxes and 360,000 engines a year. The gearboxes and engines produced in Wałbrzych go into Toyota cars assembled at the group's European plants.

How it went

Assessment: settled, as of 25 Jul 2026. This is our reading, not a verdict, and we show it only where a quote from a source listed below stands behind it. Of the four, 2 carry no assessment yet. How to read this section

Deliverydelivered[1]
Utilisationin use[2]
zakład czynny – produkcja skrzyń biegów i silników
Current
od 2002 r. wyprodukowano ponad 1,5 mln silników i ponad 3 mln skrzyń biegów (2002–)
Capacity or target
720 000 skrzyń biegów i 360 000 silników rocznie
Unit
szt.

Timeline

  1. Delivery2002

Significance

The Toyota plant in Wałbrzych was one of the largest Japanese greenfield investments in Lower Silesia and became Toyota's largest components-production centre outside Japan. Located in the Wałbrzych Special Economic Zone (Invest-Park), the plant started producing gearboxes in 2002 and subsequently also engines, supplying components to Toyota cars assembled at the group's plants in Europe. The investment employed approximately 2,000 people and was one of the pillars of automotive-industry development in the Wałbrzych region.

Sources 5 · 4 independent · 5 archived

Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.

Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.

  1. investmap.pl
    CostDelivery
    CostWartość inwestycji Około 540 milionów Euro
    DeliveryData uruchomienia produkcji 10 kwietnia 2002 roku
  2. Forsal.pl24 Sep 2010
    StatusStageInvestorUtilisation
    Statushistoria jej produkcji rozpoczęła się w kwietniu 2002 r.
    Stage · UtilisationOd 2002 r. w wałbrzyskiej fabryce powstało ponad półtora miliona silników i ponad trzy miliony skrzyń biegów
    InvestorToyota Motor Manufacturing Poland została założona w sierpniu 1999 r.
  3. Toyota Motor Manufacturing Poland2026
  4. Auto Świat2022
  5. Funding
    FundingUmowa zobowiązała japońską firmę do zainwestowania prawie 372 mln zł z własnej kasy do końca 2018 i stworzenia przynajmniej 50 nowych miejsc pracy do już istniejących 477 etatów.
    FundingMinisterstwo Rozwoju zgodziło się wesprzeć tę inwestycję okrągłą kwotą 3 mln zł, z czego w 2018 roku Toyota dostanie przeszło 1,93 mln zł, a ponad 1 mln zł w 2019 r.