← all projects
🏭Industrystrategic

SK Nexilis copper foil factory in Stalowa Wola

under constructionstage: commissioning
3.0 bn PLN
programme budget (multi-year) · data from 2022net or gross: not recorded≈ 3.0 bn PLN (value-by-stage, est., nominal)

A plant producing copper foil for electric vehicle batteries, being built by the South Korean company SK Nexilis (SKC group) in Stalowa Wola. Construction was inaugurated in 2022, and production was originally planned to start in mid-2024; the schedule was delayed, among other reasons, due to the slowdown in the electric vehicle market. The declared value of the investment is approx. PLN 3 billion, and the target production capacity is approx. 50 thousand tonnes of foil per year, which is to make the plant the largest facility of its kind in Europe. At the turn of 2024 and 2025 the project received a grant from the Polish government of PLN 545 million (approx. USD 133 million) under the EU Temporary Crisis and Transition Framework. Construction was completed in 2025, but the start of production was repeatedly postponed for want of offtake customers (Business Post, March 2026). In August 2026, having obtained its integrated IPPC permit, the plant was in the final preparation and verification phase ahead of full-scale production (The Guru, 6 Aug 2026) – commercial output had not yet begun. The June open days were a recruitment event, not confirmation of a production start.

How it went

We have assessed this project, but none of the four axes is shown here: 3 carry no assessment yet, one has an assessment with no confirmed quote. The timeline and sources below show what is known about it. How to read this section

Timeline

  1. Announced2022
  2. Construction start2022
  3. Original date2024

Change history

  • 2022stage: construction

Significance

The factory is intended to strengthen the domestic supply chain for electromobility, providing copper foil used in the batteries of electric vehicles. The investment, with a target capacity of approx. 50 thousand tonnes per year, is to create over 500 jobs in the region and fits into the expansion of European cell production facilities; the plant was to supply copper foil to, among others, Northvolt.

Sources 11 · 10 independent · 7 archived

Every fact on this card comes from the sources below. Next to each source – which fields it supports.

Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.

  1. Notes from Poland11 Jul 2022
    InvestorCostAnnouncedOriginal date
    Investor · AnnouncedSK Nexilis, a South Korean manufacturer of copper foil used in electric-car batteries, has inaugurated the construction of a 3 billion zloty (€627 million) factory
    Costhas inaugurated the construction of a 3 billion zloty (€627 million) factory in the southeastern Polish city of Stalowa Wola
    Original dateNexilis wants the copper foil factory, located in a special investment zone established last year, to be up and running by mid-2024
  2. Mikrokontroler.pl10 Jan 2025
    Construction start
    Construction startSK Nexilis rozpoczął budowę fabryki w 2022 roku
  3. Carpatia Biznes30 Dec 2024
    Funding
    Locationbudowy zakładu produkcyjnego folii miedzianej w Stalowej Woli
    FundingSK Nexilis, największy na świecie producent folii miedzianej, otrzymał od polskiego rządu dotację w wysokości 545 milionów złotych (133 miliony dolarów).
  4. WysokieNapiecie.pl2022
  5. The Korea Herald19 Feb 2023
  6. The Korea Herald26 Dec 2024
    Status
    Statusat its plant under construction in Stalowa Wola, eastern Poland
  7. Echo Dnia PodkarpackieJun 2026
  8. Funding
    FundingThe total investment of SKC and its wholly-owned subsidiary SK Nexilis, which specialises in the production of copper foils, is stated at 900 billion won or about 693 million euros.
  9. 비즈니스포스트 (Business Post)1 Mar 2026
    StatusStage
    Status · Stage폴란드 공장은 지난해 준공했음에도 수요처를 찾지 못해 가동 시점을 연기해왔다.
  10. 더구루 (The Guru)6 Aug 2026
    StageStatus
    Stage · Status현재 공장은 본격적인 생산을 앞두고 최종 준비와 검증 단계에 진입했다.