Central Trunk Line (Line 4) upgrade to 200 km/h for Pendolino (Grodzisk Maz. – Zawiercie)
Upgrading the Central Trunk Line (railway line no. 4, Grodzisk Mazowiecki – Zawiercie, approximately 224 km) to a train speed of 200 km/h. This was the first operation of conventional rail at this speed in Poland. The infrastructure manager is PKP Polskie Linie Kolejowe S.A. In 2010–2014 the Włoszczowa Płn. – Olszamowice section (excluding both stations) was upgraded: the overhead traction network was replaced, engineering structures were refurbished, and the trackbed was reinforced at selected points. On 14 December 2014 ED250 Pendolino trains began scheduled running at 200 km/h on the Zawiercie – Olszamowice section; Poland became the first of the states that joined the European Union in 2004 to introduce a train speed above 160 km/h. On 10 December 2017 the 200 km/h speed was also introduced on the Grodzisk Mazowiecki – Idzikowice section (80 km). This record covers the 200 km/h phase of the project, completed by 2017. The later upgrade of the Central Trunk Line to a speed of 230–250 km/h (including ERTMS/ETCS level 2 on the Korytów – Zawiercie section, and works financed from the National Recovery Plan worth around PLN 1.8 billion) is a separate programme carried out after 2020 and is not covered by this record.
How it went
Assessment: settled, as of 25 Jul 2026. This is our reading, not a verdict, and we show it only where a quote from a source listed below stands behind it. Of the four, 2 carry no assessment yet, one has an assessment with no confirmed quote. How to read this section
A “wiki” mark means the value stands on Wikipedia alone. Our count of independent sources treats it as zero, so read such a place as less firmly documented than the rest of the card – that applies to an outcome row, a figure, a date and a status alike.
- Current
- planowe kursowanie pociągów ED250 Pendolino z prędkością 200 km/h od 14 grudnia 2014 (Zawiercie–Olszamowice) i od 10 grudnia 2017 (Grodzisk Maz.–Idzikowice) (od 2014)
Timeline
Change history
- 10 Dec 2017stage: operational
- 14 Dec 2014stage: operational
Significance
The upgrade of the Central Trunk Line to 200 km/h made Line 4 the first railway route in Poland on which passenger trains run at 200 km/h, and made Poland the first state admitted to the European Union in 2004 to cross the 160 km/h threshold in passenger traffic. It enabled the introduction of the flagship Express InterCity Premium services with ED250 Pendolino trains and shortened journey times on the Warsaw – Katowice/Krakow axis. The 200 km/h phase became the foundation for the later programme, carried out after 2020, to upgrade the trunk line to a speed of 230–250 km/h.
Sources 5 · 3 independent · 4 archived
Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.
Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.
A “wiki” mark means the value stands on Wikipedia alone. Our count of independent sources treats it as zero, so read such a place as less firmly documented than the rest of the card – that applies to an outcome row, a figure, a date and a status alike.
- Wikipedia (pl)StatusStageConstruction startDeliveryInvestorUtilisation
Status · Utilisation14 grudnia 2014 ED250 Pendolino rozpoczęły planowe kursowanie z prędkością 200 km/h na odcinku Zawiercie-Olszamowice.
Stage · Delivery10 grudnia 2017 na odcinku Grodzisk Mazowiecki – Idzikowice (80 km) wprowadzono prędkość 200 km/h
Construction startW latach 2010–2014 zmodernizowano odcinek Włoszczowa Płn. – Olszamowice, ale bez obu stacji. Wymieniono sieć trakcyjną, wyremontowano wszystkie obiekty inżynierskie
InvestorZarządca PKP PLK
- PKP Polskie Linie Kolejowe S.A. (Mapa inwestycyjna)Cost
CostWartość projektu 1 688 468 856,00 PLN
- Rynek Kolejowy5 Sep 2017
- Rynek Kolejowy
- PortalSamorzadowy.pl21 Sep 2023