Wrocław Motorway Bypass A8 (including the Rędzin Bridge over the Oder)
The Wrocław Motorway Bypass (AOW, A8 motorway) is a route of more than 35 km bypassing Wrocław to the west and north, built between 2008 and 2011 and opened to traffic in full on 31 August 2011. The investor was the General Directorate for National Roads and Motorways (GDDKiA), Wrocław Branch, and the project was financed entirely from the state budget; its value exceeded PLN 4 billion. Individual sections were carried out by, among others, Budimex SA, the Mostostal Warszawa / Acciona Infraestructuras consortium, and a consortium led by Strabag. The route's main structure is the Rędzin Bridge over the Oder, a cable-stayed bridge with the tallest pylon in Poland (122 m) and a length, including approach viaducts, of 1,742 m, ranked among the largest concrete bridges in the world. The Rędzin Bridge is part of this project and is not counted separately.
How it went
Assessment: settled, as of 31 Aug 2011. This is our reading, not a verdict, and we show it only where a quote from a source listed below stands behind it. Of the four, 2 carry no assessment yet. How to read this section
- Current
- cała obwodnica otwarta do ruchu 31 sierpnia 2011
Timeline
- Construction start2008
- Delivery31 Aug 2011
Significance
The Wrocław Motorway Bypass took transit traffic, including heavy goods traffic, out of Wrocław's city centre, closing the western-northern road ring around the city and connecting the national roads and the A4 motorway that feed into it. Its most recognisable element is the Rędzin Bridge over the Oder, a cable-stayed bridge with the tallest pylon in Poland (122 m), one of the largest concrete bridges in the world and the flagship structure of a project completed ahead of Euro 2012.
Sources 4 · 3 independent · 4 archived
Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.
Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.
- Generalna Dyrekcja Dróg Krajowych i Autostrad1 Sep 2011StatusInvestorFundingDelivery
Status · DeliveryAUTOSTRADOWA OBWODNICA WROCŁAWIA OTWARTA DO RUCHU!
InvestorInwestor: Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział we Wrocławiu
FundingInwestycja finansowana z budżetu państwa.
- conadrogach.plStageCostConstruction startDeliveryUtilisation
Stage · DeliveryAutostradowa Obwodnica Wrocławia została oddana do ruchu w całości i w pełnym zakresie 31 sierpnia 2011 roku.
CostBudowa kosztowała około 4 mld zł i została w całości sfinansowana z budżetu Państwa.
Construction startBudowa A8 prowadzona była w latach 2008 - 2011
UtilisationZ uwagi na duży ruch miejski i okołomiejski oraz połaczenie z autostradą A4 i drogą S5 często dochodzi do zatorów na A8 - obwodnicy Wrocławia.
- Wikipedia (pl)
- Funding
Fundingdofinansowanie z UE 2 796 119 019,30 zł