A1 motorway Stryków (Łódź Północ) – Tuszyn (eastern Łódź bypass)
An approximately 40-kilometre section of the A1 motorway from the Stryków interchange (Łódź Północ) to the Tuszyn interchange, forming the eastern bypass of Łódź, built by the General Directorate for National Roads and Motorways (GDDKiA). The investment was divided into three work packages: Package I (14.1 km, Łódź Północ interchange – Brzeziny) carried out by the Strabag/Budimex consortium for PLN 339,623,175.69, Package II (11 km, Brzeziny – Romanów) by Mota-Engil Central Europe for PLN 360,747,073.93, and Package III (approximately 16 km, Romanów – Tuszyn) by the Budimex/Strabag consortium for PLN 327,041,625. The tender was announced on 6 February 2014, contracts with contractors were signed in September-October 2014, and the entire section was opened to traffic on 1 July 2016. The total construction cost of the three packages was approximately PLN 1.03 billion. The route moved transit traffic away from the centre of Łódź and closed the A1 motorway route in the Łódź agglomeration area.
How it went
Assessment: settled, as of 25 Jul 2026. This is our reading, not a verdict, and we show it only where a quote from a source listed below stands behind it. Of the four, 2 carry no assessment yet, one has an assessment with no confirmed quote. How to read this section
Timeline
Change history
- 1 Jul 2016stage: operational
Significance
The opening on 1 July 2016 of the approximately 40-kilometre A1 Stryków – Tuszyn section created the eastern bypass of Łódź, moving transit traffic away from the city centre and closing the A1 motorway route in the Łódź agglomeration area as part of the north-south corridor. The investment, worth a total of approximately PLN 1.03 billion, was carried out in three work packages by the Strabag/Budimex, Mota-Engil, and Budimex/Strabag consortia, at an average cost of around PLN 25 million per kilometre.
Sources 7 · 6 independent · 6 archived
Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.
Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.
A “wiki” mark means the value stands on Wikipedia alone. Our count of independent sources treats it as zero, so read such a place as less firmly documented than the rest of the card – that applies to an outcome row, a figure, a date and a status alike.
- Money.pl1 Jul 2016StatusCostAnnounced
StatusGeneralna Dyrekcja Dróg Krajowych i Autostrad (GDDKiA) otworzyła 40-kilometrowy odcinek autostrady A1 od Strykowa do Tuszyna.
CostPoszczególne odcinki zbudowały za łącznie 1,03 mld zł konsorcja Strabagu z Budimeksem oraz Mota-Engil.
AnnouncedPrzetarg na dokończenie budowy 40 kilometrowego odcinka Stryków - Tuszyn został ogłoszony 6 lutego 2014 r.
- Strabag Sp. z o.o.Construction startInvestor
Construction startOkres realizacji: 10/2014-08/2016
InvestorInwestor: Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Łodzi
- Inżynier Budownictwa17 Jun 2016
- Dostawczakiem.plJul 2016StageDelivery
Stage · DeliveryOddany 1 lipca 40-kilometrowy odcinek autostrady A1 od Strykowa do Tuszyna
- Wikipedia (pl)Delivery
DeliveryOddany do użytku 1 lipca 2016 roku[80].
- Funding
FundingWszystkie zadania inwestycyjne, za wyjątkiem inwestycji kubaturowych, finansowane będą z Krajowego Funduszu Drogowego ulokowanego w Banku Gospodarstwa Krajowego.