Modernisation of railway line E20, Siedlce – Terespol section

completedstage: operational
PLN 1.1 billion
programme budget (multi-year) · data from 2006net or gross: not recorded≈ PLN 1.1 billion (value-by-stage, est., nominal)funding: EU funds, state fundsLimitations: the amount recorded at the current stage, nominal, not adjusted for inflation. The total cost of the project may differ.

Modernisation of railway line E20 on the Siedlce – Terespol section, 121 km long, which forms part of Pan-European Transport Corridor II, running from west to east and linking Berlin with Moscow, leading to the border crossing with Belarus at Terespol. The aim was to bring the line up to a speed of 160 km/h for passenger traffic and 120 km/h at an axle load of 221 kN for freight traffic. The investment, carried out by PKP Polskie Linie Kolejowe S.A., was implemented in stages: stage I (planned for 2004-2007), co-financed from the EU ISPA/Cohesion Fund (project no. 2001/PL/16/P/PT/012, funding sources: ISPA grant 75%, state budget 25%), covered the rebuilding of tracks, the overhead traction network, level crossings and engineering structures; the opening ceremony for the modernised section took place on 17 September 2009. Stage II, co-financed from EU funds, was carried out with completion planned for July 2015 and covered, among other things, the rebuilding of 52 infrastructure elements (level crossings, footbridges, viaducts, platforms, signal boxes) and the modernisation of the Biała Podlaska, Małaszewicze and Terespol stations; the value of the stage II works contract exceeded PLN 0.5 billion gross. According to the EU subsidy register, the value of the project "Modernisation of railway line E20 on the Siedlce – Terespol section, Phase I" was PLN 1,115,154,534.62, of which EU co-financing from the Cohesion Fund accounted for PLN 675,912,480.50; the beneficiary was PKP Polskie Linie Kolejowe S.A. The cost figure in this record refers to the project value registered in the EU subsidy register (Phase I), not to the summed value of all stages from 2004-2015.

How it went

No outcome assessment on this card. This is not a fault: we show an assessment only where a source quote stands behind it. Of the four axes, 2 carry no assessment yet, 2 have an assessment with no confirmed quote. The timeline and sources below show what is known about the project. How to read this section

No source calls this a delay and the card makes no assessment here, but the dates recorded on this project differ by 2 years: originally 2013, currently 2015.

Timeline

  1. Original date2013
  2. Last stated date2015

Significance

The modernised Siedlce – Terespol section is the eastern part of line E20 (LK2) Warsaw – Terespol, leading to the border crossing with Belarus and further east, forming part of Pan-European Transport Corridor II and the trans-European transport network (TEN-T). Raising the line's parameters to 160 km/h for passenger traffic and 120 km/h for freight traffic improved capacity and journey times on one of Poland's main east–west transit routes.

Sources 5 · 4 independent · 4 archived

Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.

Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.

  1. Mapa Dotacji UE (mapadotacji.gov.pl)
    CostInvestorFunding
    Costwartość projektu 1 115 154 534,62 zł
    Investornazwa beneficjenta Polskie Koleje Państwowe, Polskie Linie Kolejowe, Spółka Akcyjna
    Fundingdofinansowanie z UE 675 912 480,50 zł
  2. PKP Polskie Linie Kolejowe S.A.
    StatusStage
    Status · Stage17 września 2009 r. odbyła się uroczystość otwarcia zmodernizowanego odcinka linii kolejowej E 20
  3. Zielone Mazowsze
    Original dateFunding
    Original dateZadanie realizowane będzie w latach 2007 – 2013.
    FundingŹródła finansowania: grant ISPA – 75%, budżet państwa – 25%.
  4. PKP Polskie Linie Kolejowe S.A.28 Nov 2014
    Last stated date
    Last stated datePo zakończeniu inwestycji w lipcu 2015 roku, pociągi pasażerskie pojadą tędy szybciej, bo z prędkością do 160 km/h
  5. Rynek Kolejowy