Water Supply and Wastewater Treatment in Łódź (Cohesion Fund Project 2004-2006)
“Water Supply and Wastewater Treatment in Łódź” is a water and wastewater management project carried out by the City of Łódź and co-financed by the European Union's Cohesion Fund under the 2004-2006 perspective. The total value of the project was PLN 711,784,326.17, including EU co-financing of PLN 303,453,485.40. The project continued work begun under the project “Wastewater Treatment in Łódź (Phase I)”, started in 2001 under the pre-accession ISPA fund. The aim was to put the water and wastewater management of the Łódź agglomeration in order, leading to an improved standard of living for residents, better quality of water supplied to residents, and an improved technical condition of the network. The scope covered modernisation and renewal investments in the water supply systems and distribution network in Łódź, modernisation of the oldest part of the city's sewerage system to protect rivers from the discharge of untreated wastewater, and the extension of the water supply network (64 km), sanitary sewerage (169 km) and stormwater sewerage (93 km), as well as the improvement of approximately 100 km of unpaved road surfaces. Wastewater from the agglomeration is received by the Grupowa Oczyszczalnia Ścieków Łódzkiej Aglomeracji Miejskiej (the Łódź Agglomeration Group Wastewater Treatment Plant), the largest wastewater treatment plant of its type in Poland.
How it went
Assessment: settled, as of 25 Jul 2026. This is our reading, not a verdict, and we show it only where a quote from a source listed below stands behind it. Of the four, 2 carry no assessment yet, one has an assessment with no confirmed quote. How to read this section
- Current
- ok. 210 tys. m³ ścieków na dobę (2026)
- Capacity or target
- docelowo ok. 350 tys. m³ na dobę
- Unit
- m³/dobę
Significance
The project was one of the largest water and wastewater management undertakings in Poland financed from the Cohesion Fund under the 2004-2006 perspective (total value PLN 711.8 million, EU co-financing PLN 303.5 million). It covered the modernisation and extension of the water supply network and of sanitary and stormwater sewerage in the Łódź agglomeration, helping to reduce the discharge of untreated wastewater into rivers and to improve the quality of water supplied to residents. Wastewater from the agglomeration flows to the Grupowa Oczyszczalnia Ścieków Łódzkiej Aglomeracji Miejskiej, the largest wastewater treatment plant of its type in Poland.
Sources 4 · 3 independent · 2 archived
Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.
Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.
- Ministerstwo Funduszy i Polityki Regionalnej (mapadotacji.gov.pl)StatusCostInvestorFunding
StatusCelem projektu było uporządkowanie gospodarki wodno-ściekowej w aglomeracji łódzkiej prowadzące do poprawy standardu życia mieszkańców, jakości wody dostarczanej mieszkańcom, stanu technicznego sieci, ograniczenia liczby awarii oraz likwidacji barier rozwojowych. Projekt stanowił kontynuację działań podjętych w ramach projektu „Oczyszczanie ścieków w Łodzi (faza I)” rozpoczętego w 2001 r. w ramach ISPA.
Costwartość projektu 711 784 326,17 zł
Investornazwa beneficjenta Miasto Łódź
Fundingdofinansowanie z UE 303 453 485,40 zł
- Wikipedia (pl)Stage
StageDo oczyszczalni wpływa obecnie 210 tys. m³ ścieków na dobę.
- Zakład Wodociągów i Kanalizacji sp. z o.o. w ŁodziUtilisation
UtilisationGrupowa Oczyszczalnia Ścieków Łódzkiej Aglomeracji Miejskiej (GOŚ ŁAM), położona na południowo – zachodniej granicy Łodzi, na prawym brzegu rzeki Ner, oczyszcza ścieki z Łodzi, Pabianic i Konstantynowa oraz z gmin Ksawerów i Nowosolna.
- Inżynieria.com / Inżynieria Bezwykopowa (nr 3/2007)1 Jan 2008Investor
InvestorMiasto Łódź inwestuje w przyszłość. Pozyskało środki z Funduszu Spójności przyznane przez Komisję Europejską, dzięki czemu realizacja dużego projektu o nazwie "Wodociągi i Oczyszczalnia Ścieków w Łodzi II", składającego się z 8 zadań o łącznej wartości ponad 142 mln EUR, stała się faktem.