← all projects
🛡Defencestrategic

SAN counter-drone system (component of the Tarcza Wschód programme)

under constructionstage: construction
PLN 15 billion
contract valuenet or gross: not recorded≈ PLN 15 billion (value-by-stage, est., nominal)funding: EU SAFE instrument, state fundsLimitations: the amount recorded at the current stage, nominal, not adjusted for inflation. The total cost of the project may differ.

The SAN counter-drone system is described as the largest integrated air-defence system in Europe, designed to detect, identify and neutralise unmanned aerial vehicles, and it is a component of the "Tarcza Wschód" (East Shield) programme. The supply contract was signed on 30 January 2026 between the State Treasury's Armament Agency (Agencja Uzbrojenia) and a consortium led by Polska Grupa Zbrojeniowa (PGZ) with the Norwegian technology partner Kongsberg Defence & Aerospace. The SAN system comprises 18 battery modules, each battery equipped with three firing platoons and one support platoon; the order also includes about 703 vehicles (roughly 400 on Jelcz platforms and about 300 on Legwan platforms). The order is worth about PLN 15 billion net (PLN 14,924.8 million according to the Polska SAFE programme table). The majority of the funds are to come from the EU SAFE programme. Polish companies supply about 60% of the system's components, with participants including PIT-RADWAR, ZM Tarnów, Rosomak, Jelcz, Huta Stalowa Wola, Mesko, Advanced Protection Systems and Transbit. The first elements are to reach the Polish Armed Forces still in 2026, and all 18 batteries are to be delivered within two years of contract signing (by around January 2028).

How it went

Assessment: too early to assess, as of 17 Aug 2026. This is our reading, not a verdict, and we show it only where a quote from a source listed below stands behind it. Of the four, 2 carry no assessment yet, one has an assessment with no confirmed quote. How to read this section

Utilisationtoo early[1]

Timeline

  1. AnnouncedJan 2026
  2. Original dateJan 2028
  3. Current dateJan 2028

Change history

  • Jan 2026stage: construction

Significance

SAN is described as the first of its kind and the largest integrated counter-drone system in Europe – a Polish response to threats posed by the mass use of drones, strengthening air defence as a component of the "Tarcza Wschód" programme along the eastern border. The programme relies heavily on domestic industry (about 60% of the system's components come from Polish plants), and according to the Minister of National Defence this type of anti-drone battery is to become a Polish export product and a brand of Polish industry.

Sources 6 · 6 independent · 5 archived

Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.

Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.

  1. Kancelaria Prezesa Rady Ministrów (gov.pl)30 Jan 2026
    StatusStageFundingUtilisation
    Status · UtilisationPierwsze elementy systemu trafią do Wojska Polskiego jeszcze w 2026 roku
    Stagedostarczenie 18 modułów bateryjnych systemów przeciwlotniczych
    Fundingwiększość środków pochodzić będzie z unijnego programu SAFE
  2. Kancelaria Prezesa Rady Ministrów / Polska SAFE (gov.pl)
    Cost
    CostSystem przeciwlotniczy SAN - 18 modułów Systemy rakietowe 14 924 815,0 zł
  3. Defence2430 Jan 2026
    Original dateCurrent date
    Original date · Current dateUmowa ma wartość około 15 mld zł, a dostawy rozpoczną się w 2026 roku i zakończą w styczniu 2028 roku.
  4. Polska Zbrojna
    InvestorFunding
    Investor · FundingUmowa została zawarta między skarbem państwa – Agencją Uzbrojenia a konsorcjum z liderem, czyli Polską Grupą Zbrojeniową, oraz partnerem technologicznym z Norwegii – Kongsberg Defence & Aerospace.
  5. Polska Agencja Prasowa30 Jan 2026
    Announced
    AnnouncedPodczas uroczystości odbywającej się w podwarszawskiej Kobyłce, w zakładach wchodzącej w skład PGZ spółki PIR-Radwar, kontrakt zawarły: odpowiadająca za zakup sprzętu dla wojska Agencja Uzbrojenia i konsorcjum złożone z PGZ, APS i norweskiego Kongsberga.
  6. StockWatch.pl30 Jan 2026