← all projects
🛡Defencestrategic

Pilica+ programme (very-short- and short-range air defence, VSHORAD)

under constructionstage: construction
PLN 3.0 billion
contract valueincl. VAT≈ PLN 3.0 billion (value-by-stage, est., nominal)Limitations: the amount recorded at the current stage, nominal, not adjusted for inflation. The total cost of the project may differ.

The Pilica+ programme builds the lowest layer of Poland's emerging air defence system – very-short- and short-range air defence – for the Polish Armed Forces. It is delivered by the PGZ-PILICA+ Consortium, led by Polska Grupa Zbrojeniowa S.A. and comprising nine companies, including Zakłady Mechaniczne "Tarnów" (technical integrator), PIT-RADWAR, PCO, JELCZ, MESKO, the R&D Marine Technology Centre (OBR CTM), Military Electronics Works and Military Armaments Works. The contract with the Armaments Agency (Agencja Uzbrojenia) covers 22 Pilica+ rocket-and-artillery systems (21 combat and one training): 16 new PSR-A Pilica systems plus the upgrade of six previously ordered systems to the Pilica+ standard. The contract for the 16 new batteries and the modernisation of six was valued at 2.98 billion PLN gross, with execution scheduled for 2025-2029. Each system combines 23 mm cannons and Piorun anti-aircraft missiles, and the Pilica+ variant adds iLauncher launchers with CAMM missiles, an automated command system and mobile Bystra radar stations. The first serial system, fully matching the target configuration, was handed over on 21 November 2025 to the 34th Air Defence Missile Squadron in Bytom, with systematic deliveries to continue through 2029. As a subsequent capability, the system is also intended to counter unmanned aerial vehicles.

How it went

Assessment: too early to assess, as of 17 Aug 2026. This is our reading, not a verdict, and we show it only where a quote from a source listed below stands behind it. Of the four, 2 carry no assessment yet, one has an assessment with no confirmed quote. How to read this section

Deliverypartial[1]

Timeline

  1. Construction start2025
  2. Original date2029
  3. Current date2029

Change history

  • Nov 2025stage: construction

Significance

Pilica+ closes the lowest layer of Poland's multi-layered air defence, complementing the short-range Narew and medium-range Wisła systems. The programme is executed by a Polish state defence consortium (PGZ-PILICA+, nine Polish companies with ZM "Tarnów" as technical integrator), sustaining domestic competence in producing anti-aircraft rocket-and-artillery systems. As a subsequent capability the systems are also intended to engage unmanned aerial vehicles, increasing their relevance amid the growing drone threat.

Sources 5 · 4 independent · 3 archived

Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.

Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.

  1. JELCZ Sp. z o.o.
    StatusInvestorOriginal dateCurrent dateDelivery
    Status · DeliveryPrzekazany system PILICA stanowi pierwszy z szesnastu seryjnych systemów, które zgodnie z umową zawartą pomiędzy Agencją Uzbrojenia oraz Konsorcjum PGZ PILICA+ zostaną dostarczone do Sił Zbrojnych Rzeczypospolitej Polskiej.
    Investorkonsorcjum PGZ-PILICA+, którego liderem jest Polska Grupa Zbrojeniowa S.A. (PGZ).
    Original date · Current dateProjekt będzie realizowany (systematyczne dostawy) do 2029 r.
  2. Defence2421 Nov 2025
    Stage
    StageTym samym rozpoczął się zasadniczy etap dostaw nowo produkowanych zestawów.
  3. Dziennik Zbrojny28 Apr 2023
    Construction startCost
    Construction startz okresem realizacji również w latach 2025-2029
    Costdrugie wycenione zostało na 2,98 mld PLN brutto i udzielone Konsorcjum PGZ-PILICA+
  4. ZBiAM22 Nov 2025
  5. Defence2412 Dec 2023