Modernisation of the Wrocław Water Node (rebuilding of Wrocław's flood protection system)

completedstage: operational
PLN 1.4 billion
programme budget (multi-year) · data from 2012net or gross: not recorded≈ PLN 1.4 billion (value-by-stage, est., nominal)planned funding: state funds, multilateral development bank, EU fundsLimitations: the amount recorded at the current stage, nominal, not adjusted for inflation. The total cost of the project may differ.

Modernisation of the Wrocław Water Node (WWW) was a major component (Component B) of the Odra River Basin Flood Protection Project (OPDO/POPDO), financed among other things by a World Bank loan and a loan from the Council of Europe Development Bank. The aim of the undertaking was to rebuild Wrocław's flood protection system in response to the catastrophic flood of 1997. The works were carried out in 2012-2018: four construction contracts were implemented in 2012-2014, and a further two contracts in 2014-2018. The scope included increasing the capacity of the Oder riverbed, improving the technical condition of the embankments and building the Oder-Widawa relief channel. The modernisation increased the node's capacity from around 2,200 m³/s to a design capacity (Qk) of just over 3,100 m³/s, allowing high water flows close to those of the 1997 flood to pass safely through the city. Until 31 December 2017, project implementation was the responsibility of two project implementation units: the Regional Water Management Board in Wrocław and the Lower Silesian Board of Land Reclamation and Water Facilities, and from 1 January 2018 the State Water Holding Polish Waters – Regional Water Management Board in Wrocław. The total cost of the undertaking was PLN 1.411 billion: PLN 703.72 million (half) was covered by the state budget, PLN 260.74 million was the contribution of the Council of Europe Development Bank, PLN 81.94 million the contribution of the World Bank, and PLN 364.94 million the contribution of the National Fund for Environmental Protection and Water Management.

How it went

No outcome assessment on this card. This is not a fault: we show an assessment only where a source quote stands behind it. Of the four axes, 2 carry no assessment yet, 2 have an assessment with no confirmed quote. The timeline and sources below show what is known about the project. How to read this section

Timeline

  1. Construction start2012
  2. Delivery2018

Change history

  • 2018stage: operational
  • 2012stage: construction

Significance

The rebuilding of the Wrocław Water Node significantly raised the level of flood protection for Wrocław and the surrounding area. Increasing the node's capacity from around 2,200 m³/s to over 3,100 m³/s allows flows close to those of the catastrophic "flood of the millennium" of 1997, when the actual flow significantly exceeded the node's capacity at the time, to pass safely through the city. The investment was one of the largest hydro-engineering undertakings in the Oder river basin and part of the state's systemic response to the 1997 flood.

Sources 3 · 3 independent · 1 archived

Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.

Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.

  1. Biuro Koordynacji Projektu Ochrony Przeciwpowodziowej Dorzecza Odry i Wisły
    StatusStageConstruction startDeliveryInvestor
    StatusModernizacja WWW zwiększyła przepustowość węzła z ok 2 200m³/s do wielkości Qk nieco ponad 3 100 m³/s
    Stage · DeliveryW latach 2014-2018 prowadzone były 2 kontrakty na roboty budowlane
    Construction startW latach 2012-2014 prowadzone były 4 kontrakty na roboty budowlane
    InvestorZa modernizację Wrocławskiego Węzła Wodnego odpowiadały do 31 grudnia 2017 r. dwie Jednostki Wdrażania Projektu: Regionalny Zarząd Gospodarki Wodnej we Wrocławiu oraz Dolnośląski Zarząd Melioracji i Urządzeń Wodnych. Od 1 stycznia 2018 r. za zadania te odpowiadał PGW WP Regionalny Zarząd Gospodarki Wodnej we Wrocławiu
  2. Portal Komunalny9 Jan 2012
    CostFunding
    CostOgromne przedsięwzięcie przebudowy Wrocławskiego Węzła Wodnego będzie kosztować jeden miliard i 411 milionów złotych.
    Funding703,72 mln zł, a więc połowę, pokryje się z budżetu państwa
    Funding260,74 mln zł to wkład Banku Rozwoju Rady Europy
    Funding81,94 mln zł doda Bank Światowy
    Funding364,94 mln zł Narodowy Fundusz Ochrony Środowiska i Gospodarki Wodnej (pieniądze z Unii Europejskiej)
  3. Mapa Dotacji UE (Ministerstwo Funduszy i Polityki Regionalnej)