← all projects
🛡Defencestrategic

GLADIUS reconnaissance-strike UAS (SAFE 2026)

under constructionstage: construction
PLN 9.3 billion
contract valuenet or gross: not recorded≈ PLN 9.3 billion (value-by-stage, est., nominal)funding: EU SAFE instrumentLimitations: the amount recorded at the current stage, nominal, not adjusted for inflation. The total cost of the project may differ.

GLADIUS (BSP-U) is a reconnaissance-strike unmanned aerial system produced by the WB Group (WB Electronics). On 28 May 2026 in Ożarów Mazowiecki, the Armaments Agency (Agencja Uzbrojenia) of the Polish Ministry of National Defence, representing the State Treasury, and the WB Group signed a contract for the delivery of 12 battery fire modules of GLADIUS. The contract is worth 9,311,212.0 thousand PLN, i.e. about 9.31 billion PLN. Deliveries are to be completed by 2030. The contract is financed from European Union funds under the SAFE mechanism, whose funds are channelled to Bank Gospodarstwa Krajowego for the Armed Forces Support Fund (Fundusz Wsparcia Sił Zbrojnych). The GLADIUS contract was signed together with contracts for FlyEye systems and Warmate loitering munitions; according to the parties, these are the largest contracts for comprehensive reconnaissance-strike solutions concluded so far not only in Poland but in all of Europe. Production is carried out in Poland, including in Skarżysko-Kamienna, Czechowice-Dziedzice, Gliwice, Gdynia and Lipka Krajeńska.

How it went

No outcome assessment on this card. This is not a fault: we show an assessment only where a source quote stands behind it. Of the four axes, 2 carry no assessment yet, 2 have an assessment with no confirmed quote. The timeline and sources below show what is known about the project. How to read this section

Timeline

  1. AnnouncedMay 2026
  2. Construction startMay 2026
  3. Original date2030
  4. Current date2030

Change history

  • May 2026stage: construction

Significance

The GLADIUS contract, worth about 9.31 billion PLN, is financed from the European SAFE instrument, whose funds flow through Bank Gospodarstwa Krajowego into the Armed Forces Support Fund. Signed on 28 May 2026 together with contracts for FlyEye and Warmate, it forms part of what the parties describe as the largest contracts for comprehensive reconnaissance-strike solutions concluded so far not only in Poland but in all of Europe. The order is fulfilled by a Polish producer (WB Group / WB Electronics), with production carried out domestically – including in Skarżysko-Kamienna, Czechowice-Dziedzice, Gliwice, Gdynia and Lipka Krajeńska – supporting the national defence industry and jobs in the regions.

Sources 4 · 4 independent · 3 archived

Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.

Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.

  1. polskasafe.gov.pl (Rząd RP)
    Cost
    Cost9 311 212,0
  2. Grupa WB1 Jun 2026
  3. Defence242 Jun 2026
    StatusStageInvestorAnnouncedConstruction startOriginal dateCurrent dateFunding
    Status · InvestorPiotr Wojciechowski, prezes GRUPY WB i generał dywizji Artur Kuptel, szef Agencji Uzbrojenia Ministerstwa Obrony Narodowej, reprezentującej Skarb Państwa, podpisali 28 maja w Ożarowie Mazowieckim trzy umowy
    StagePierwsza z podpisanych w Ożarowie Mazowieckim umów dotyczyła dostaw 12 bateryjnych modułów ogniowych bezzałogowych systemów poszukiwawczo-uderzeniowych Gladius.
    Announced · Construction startpodpisali 28 maja w Ożarowie Mazowieckim trzy umowy

    year taken from the source's publication date (2 Jun 2026)

    Original date · Current dateSiły Zbrojne RP mają odebrać je do 2030 roku.
    FundingKontrakty będą finansowane ze środków Unii Europejskiej w ramach mechanizmu SAFE.
  4. Council of the European Union