Yamal–Europe gas pipeline – Polish section (Line I)

completedstage: operational
funding: the investor’s own funds

The Polish section of the Yamal–Europe transit gas pipeline, running from the village of Kondratki on the border with Belarus to the vicinity of the village of Górzyca near the border with Germany, with a length of 684 km. Construction was preceded by the "Agreement between the Government of the Republic of Poland and the Government of the Russian Federation on the construction of a gas pipeline system for the transit of Russian gas across the territory of the Republic of Poland and gas supplies to the Republic of Poland," signed on 25 August 1993. The company Europol Gaz S.A. was established to build and operate the pipeline (shareholders: PGNiG/PKN Orlen 48%, Gazprom 48%, Gas-Trading 4%). In September 1999, Europol Gaz S.A. completed construction of the entire first line of the pipeline on Polish territory – the final, so-called golden weld was made on 23 September 1999. Five compressor stations operate along the route (Kondratki, Zambrów, Ciechanów, Włocławek, Szamotuły), and the pipeline's capacity was 32.96 billion m³ per year.

How it went

No outcome assessment on this card. This is not a fault: we show an assessment only where a source quote stands behind it. Of the four axes, 2 carry no assessment yet, 2 have an assessment with no confirmed quote. The timeline and sources below show what is known about the project. How to read this section

Timeline

  1. Announced25 Aug 1993
  2. Delivery23 Sep 1999

Change history

  • 23 Sep 1999status: completedThe making of the so-called golden weld completed construction of the first string of the Polish section of the gas pipeline.
  • 23 Sep 1999stage: operational

Significance

The Yamal–Europe pipeline is one of the largest energy infrastructure investments completed in Poland after 1989 and the main corridor for the transit of Russian natural gas across the country, established on the basis of the 1993 Polish–Russian intergovernmental agreement. The main line, 684 km long with a capacity of nearly 33 billion m³ per year and five compressor stations, played a key role for years in the transit of gas to Western Europe as well as in supplies to Poland. Since 2022, no Russian gas has been transmitted through the pipeline; the transmission infrastructure on Polish territory has been operated by Gaz-System since 2010.

Sources 5 · 3 independent · 3 archived

Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.

Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.

A “wiki” mark means the value stands on Wikipedia alone. Our count of independent sources treats it as zero, so read such a place as less firmly documented than the rest of the card – that applies to an outcome row, a figure, a date and a status alike.

  1. Wikipedia (pl)
    StatusStageAnnouncedDeliveryInvestor
    StatusWe wrześniu 1999 roku Europol Gaz S.A. zakończył budowę całej pierwszej nitki gazociągu Jamał-Europa na terytorium Polski
    Stageprzepustowość gazociągu wynosiła 32,96 mld m³/rok
    Announced25 sierpnia 1993 roku zostało podpisane „Porozumienie między Rządem Rzeczypospolitej Polskiej a Rządem Federacji Rosyjskiej
    DeliveryOstatni, tzw. złoty spaw na gazociągu wykonano 23 września 1999 roku
    InvestorWłaściciele gazociągu na terenie poszczególnych państw[12]: Rosji i Białorusi jest Gazprom Polski jest Europol Gaz S.A., kontrolowany przez Orlen.
  2. Wikipedia (pl)
    Funding
    FundingBudowa I nitki gazociągu (pozwalająca na maksymalny roczny przesył rzędu 32,96 mld m³) trwała w latach 1994–1999, pierwotnie partycypacja pieniężna strony polskiej miała zamknąć się w koszcie do 350 mln dolarów, jednak ostatecznie w 2003 r. strona polska zapłaciła 150 mln dolarów
  3. Najwyższa Izba Kontroli (NIK)18 Jul 2019P/18/014/KGP
    StatusStageInvestor
    Status · Stage · InvestorSystem Gazociągów Tranzytowych EuRoPol GAZ SA to właściciel polskiej części gazociągu przesyłowego Jamał-Europa, istotnej części systemu przesyłowego gazu ziemnego w Polsce. Gazociągiem o długości ok. 684 kilometrów, przesyłany jest gaz ziemny na potrzeby odbiorców krajowych (ok. 3 mld m3 rocznie) i zagranicznych (ok. 30 mld m3 rocznie).
  4. WNP.PL (Portal gospodarczy)6 Jan 2026
    Stage
    StageJednak do tego nigdy nie doszło, bo też gazociąg, który ruszył w 1999 r., nie został dokończony.
  5. Energetyka245 Jun 2026
    Investor
    InvestorOd 2024 roku jedynym właścicielem tego strategicznego kawałka infrastruktury jest Grupa Orlen