Miejska Górka Wind Farm (TAURON Zielona Energia)
An onshore wind farm being built by TAURON Zielona Energia in Rawicz County (Wielkopolskie Voivodeship). The installation is to consist of 53 turbines with a rated capacity of 3.6 MW each and a height of 134 m, giving a target capacity of approximately 190 MW. Once completed, it is to be the largest wind investment of the TAURON Group and the second-largest onshore wind farm in Poland. The project was purchased in 2024, and its completion was scheduled for the second half of 2027. By August 2025 the foundations for all 53 turbines had been poured.
Timeline
- Announced Sep 2024
- Original date 2027
- Current date 2027
Change history
- Aug 2025 status: under construction Farm under construction — foundations poured for all 53 turbines; work ongoing on assembly yards, roads and electrical substations.
- Aug 2025 stage: construction
Significance
The target capacity of approximately 190 MW from 53 turbines is to cover the demand of nearly 200 thousand households and make the farm the largest wind investment of the TAURON Group as well as the second-largest onshore wind farm in Poland after Potęgowo. The investment significantly increases national onshore wind generation capacity and shifts the balance of the state-owned group's renewables portfolio toward wind power.
Sources 4
Every fact on this card comes from the sources below. Next to each source — which fields it supports.
- TAURON Polska Energia (biuro prasowe) 24 Sep 2024CostAnnouncedOriginal dateInvestor
Cost „Całkowity koszt ma wynieść niespełna 2 mld zł"
Original date „realizacja tego projektu zakończy się w drugiej połowie 2027 roku"
locations[0].voivodeship „Farma wiatrowa Miejska Górka zlokalizowana będzie w powiecie rawickim, w województwie wielkopolskim"
- TAURON Zielona EnergiaInvestor
Investor „TAURON Zielona Energia sp. z o.o."
- Biznes PAP 24 Sep 2024CostAnnounced
Announced „Tauron kupił projekt farmy wiatrowej Miejska Górka o mocy docelowej ok. 190 MW"
- TAURON Polska Energia (biuro prasowe) 27 Aug 2025StatusStageCurrent date
Status „podczas budowy wylano fundamenty dla wszystkich, 53 nowoczesnych turbin wiatrowych"
Stage „Zakończyliśmy prace związane z betonowaniem fundamentów. Obecnie kontynuowane są działania przy budowie placów montażowych, dróg dojazdowych, linii kablowych oraz stacji elektroenergetycznych"