A district thermal power plant in Brzezie near Dobrzeń Wielki outside Opole, whose original stage comprised four power units commissioned in 1993-1997 with a combined installed capacity of 1492 MW (1×376 MW, 1×373 MW, 1×373 MW, 1×370 MW). The first unit was placed into operation on 23 February 1993, and the subsequent units in the following years through to 1997. Construction of the power plant as an investment of national significance was carried out from the 1970s. The facility is managed by PGE Górnictwo i Energetyka Konwencjonalna S.A. Oddział Elektrownia Opole. The record-breaking capacity of units 1-4 made Opole one of the largest power plants in the country; the construction of units 5 and 6 (2014-2019) was a separate, later investment.
How it went
No outcome assessment on this card. This is not a fault: we show an assessment only where a source quote stands behind it. Of the four axes, 2 carry no assessment yet, 2 have an assessment with no confirmed quote. The timeline and sources below show what is known about the project. How to read this section
Timeline
Change history
- 1997status: completedCommissioning of the last of the four original units completed the 1993–1997 stage.
- 1997stage: operational
- 23 Feb 1993stage: operational
Significance
The four units of the Opole Power Plant commissioned in 1993-1997 (1492 MW in total) were one of the largest energy investments completed in Poland in the first half of the 1990s and for years constituted one of the key sources of capacity in the National Power System. The coal-fired power plant became a pillar of energy supply in the Opole region and on a national scale, and the experience gained from its operation was the basis for the later expansion with units 5 and 6.
Sources 4 · 3 independent · 1 archived
Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.
Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.
A “wiki” mark means the value stands on Wikipedia alone. Our count of independent sources treats it as zero, so read such a place as less firmly documented than the rest of the card – that applies to an outcome row, a figure, a date and a status alike.
- Wikipedia (pl)StatusDeliveryInvestor
StatusEksploatowane są 4 bloki energetyczne, uruchomione w latach 1993–1997
DeliveryEksploatowane są 4 bloki energetyczne, uruchomione w latach 1993–1997, oraz 2 bloki wybudowane w latach 2014–2019, o łącznej mocy osiągalnej 3342 MW[2]:
InvestorPGE Górnictwo i Energetyka Konwencjonalna S.A. Oddział Elektrownia Opole
- Inżynieria.comStage
Stageobecnie eksploatowane są cztery bloki energetyczne, uruchomione w latach 1993-1997, o łącznej mocy zainstalowanej 1492 MW (1×376 MW; 1×373 MW; 1×373 MW; 1×370 MW)