EcoGenerator Waste Thermal Treatment Plant in Szczecin

completedstage: operational
PLN 698 million
programme budget (multi-year) · data from 2017net of VAT≈ PLN 698 million (value-by-stage, est., nominal)funding: EU funds, private finance, the investor’s own fundsLimitations: the amount recorded at the current stage, nominal, not adjusted for inflation. The total cost of the project may differ.

EcoGenerator is a Waste Thermal Treatment Plant located on Ostrów Grabowski in Szczecin, built for the Szczecin Metropolitan Area. Construction began in February 2014, and the plant started operating in December 2017 (the original completion deadline had been planned for December 2016). The plant was designed to process approximately 150,000 tonnes of municipal waste per year into electricity and heat, using two thermal-conversion lines. The investment was valued at PLN 698 million net; financing included a PLN 279 million grant from the Cohesion Fund under the Operational Programme Infrastructure and Environment 2007–2013 (channelled via the National Fund for Environmental Protection and Water Management), bonds issued to Bank Pekao SA, and the investor's own funds. The owner and operator is the municipal company Zakład Unieszkodliwiania Odpadów sp. z o.o. w Szczecinie (Waste Disposal Plant Ltd. in Szczecin). The general contractor was Mostostal Warszawa in 2012–2016, and from 2016 until completion, the Italian company TM.E S.p.A. Termomeccanica Ecologia.

How it went

No outcome assessment: this record carries none on any of the four axes yet. The timeline and sources below show what is known about it; the assessment itself has not been made.

Timeline

  1. Construction startFeb 2014
  2. Original dateDec 2016
  3. DeliveryDec 2017

Change history

  • Dec 2017status: completedUruchomienie instalacji i rozpoczęcie pracy zakładu.
  • Dec 2017stage: operational
  • Feb 2014status: in progressRozpoczęcie budowy zakładu na Ostrowie Grabowskim.
  • Feb 2014stage: construction

Significance

EcoGenerator was one of several large municipal-waste thermal-treatment plants built in Poland with EU co-financing under the 2007–2013 perspective. The plant processes approximately 150,000 tonnes of waste per year from Szczecin and the Szczecin Metropolitan Area, generating electricity and heat (cogeneration turbine capacity of approximately 10 MWe and 30 MWt) and completing the regional waste management system in line with the EU waste-recovery hierarchy.

Sources 5 · 5 independent · 5 archived

Every fact on this card comes from the sources below. Next to sources with a quote you can see which fields they support.

Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.

  1. Zakład Unieszkodliwiania Odpadów sp. z o.o. w Szczecinie
    CostInvestorFunding
    Cost698 mln zł netto
    InvestorWłaściciel zakładu Zakład Unieszkodliwiania Odpadów sp. z o.o.
    Funding279 mln zł – dotacja z Funduszu Spójności w ramach Programu Operacyjnego Infrastruktura i Środowisko.
    Funding372 mln zł – obligacje Banku Pekao SA.
    Funding47 mln zł – środki własne ZUO.
  2. Sweco Polska
    StatusStageDelivery
    Status · Stage · DeliveryZlokalizowana na Ostrowie Grabowskim instalacja rozpoczęła pracę w grudniu 2017 r.
  3. Urbanity.pl
    Construction start
    Construction startBudowa zabudowy EcoGenerator rozpoczęła się w lutym 2014 i trwała 46 miesięcy.
  4. muratorplus.pl
    Original date
    Original dateZakończenie budowy: grudzień 2016
  5. Rynek Infrastruktury