Second nuclear power plant (EJ2, Konin or Bełchatów)

plannedstage: announced

A planned second Polish nuclear power plant (EJ2), envisaged in the Polish Nuclear Power Programme (PPEJ) alongside the first plant in the Pomerania region. The programme calls for the construction of two power plants with a combined capacity of 6-9 GWe. In the updated PPEJ, presented on 12 June 2026 by the Ministry of Energy, Bełchatów and Konin were indicated as the preferred locations - regions associated with large conventional-power assets (Kozienice and Połaniec are also under consideration on a broader shortlist). According to the schedule, the selection of a strategic partner and technology for EJ2 is planned for 2027, and the designation of the location for 2028. Construction of the first unit is planned to begin in 2032, with commissioning in 2040. Site surveys at the candidate locations are being conducted by Polska Grupa Energetyczna, although the project investor has not yet been formally designated.

How it went

Assessment: too early to assess, as of 15 Jul 2026. This is our reading, not a verdict, and we show it only where a quote from a source listed below stands behind it. Of the four, 3 carry no assessment yet. How to read this section

Deliverynot yet due[2]

Timeline

  1. Current date2040

Change history

  • 12 Jun 2026stage: announced

Significance

The second nuclear power plant is a key element in delivering the PPEJ objective of building two nuclear power stations with a combined capacity of up to 9 GWe. It is intended to strengthen the country's energy security and to replace coal capacity being phased out with stable, low-emission energy production. Naming Bełchatów and Konin as the preferred locations ties the investment to regions losing jobs in conventional power generation, offering a chance to transform these areas. However, the distant time horizon (location choice in 2028, start of production only in 2040) and the absence of a designated investor and technology mean that the project is at a very early stage and carries considerable uncertainty.

Sources 7 · 5 independent · 6 archived

Every fact on this card comes from the sources below. Next to each source – which fields it supports.

Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.

  1. Ministerstwo Energii / gov.plJun 2026
    Significance
    SignificanceStrategiczny cel pozostaje niezmienny – budowa dwóch elektrowni jądrowych i nawet 9 GWe nowych mocy
  2. Energetyka2412 Jun 2026
    StageStage historyCurrent dateDescriptionDelivery
    StageElementem, który przykuł uwagę mediów podczas prezentacji aktualizacji PPEJ, jest przygotowanie drugiej dużej elektrowni jądrowej.
    Stage historyMinisterstwo Energii przedstawiło dziś założenia aktualizacji Programu polskiej energetyki jądrowej (PPEJ).
    Current date · DeliveryKolejne kamienie milowe mają obejmować rozpoczęcie budowy w 2032 r. oraz uruchomienie pierwszego bloku w 2040 r.
    Location · DescriptionResort wskazał cztery preferowane lokalizacje: Bełchatów, Konin, Kozienice i Połaniec.
  3. PortalSamorzadowy.plJun 2026
  4. BiznesAlert.pl2026
    Status
    StatusWstępne wskazanie regionu planowane jest na 2026 rok, natomiast pełne zatwierdzenie lokalizacji, ze wskazaniem konkretnego miejsca, następuje po wykonaniu pełnych badań
  5. PortalSamorzadowy.pl2026
    LocationJest Konin i jest Bełchatów - i nie da się ukryć, że o tę drugą lokalizację będzie rywalizacja
  6. enerad.plMar 2025
  7. Funding
    FundingW dokumencie zapisano też, że przy drugiej elektrowni państwo chce ograniczać bezpośrednie zaangażowanie kapitałowe Skarbu Państwa i mobilizować kapitał prywatny.