CCGT Włocławek combined-cycle CHP plant (463 MW)

completed stage: operational
1.4 bn PLN
programme budget (multi-year) · data from 2017 ≈ 1.4 bn PLN (value-by-stage, est., nominal)

A CCGT combined-cycle unit in Włocławek with an electrical capacity of 463 MWe, built by PKN Orlen as Poland's first large-scale unit of this type. The installation operates in cogeneration, producing electricity as well as heat and process steam for the needs of the neighbouring Anwil chemical plant and the entire industrial complex in Włocławek; surplus electricity is fed into the National Power System. The general contractor was a consortium of General Electric and SNC-Lavalin Polska. The cornerstone was laid in April 2013, and the investment was completed — behind the original schedule — on 19 June 2017. Total capital expenditure was estimated at nearly PLN 1.4 billion. The unit's overall efficiency exceeds 60 percent.

Timeline

  1. Construction start Apr 2013
  2. Delivery Jun 2017

Change history

  • Mar 2018 stage: operational
  • Jun 2017 stage: commissioning
  • Apr 2013 stage: construction

Significance

Poland's first large-scale combined-cycle gas CHP plant (463 MWe), built by PKN Orlen. High-efficiency cogeneration (overall efficiency >60 percent) ensures security of supply of electricity and process steam for the Anwil plant and the entire industrial complex in Włocławek, while surplus power is directed to the National Power System. The investment strengthened the fuel group's presence in energy generation and became a model project for subsequent CCGT units built in Poland.

Sources 3

Every fact on this card comes from the sources below. Next to each source — which fields it supports.

  1. Politechnika Warszawska (Wydział ITC)
    CostConstruction startStage historyInvestorSignificance
    name.pl „Nowy blok o mocy 463 MWe wytwarza ciepło w skojarzeniu z energią elektryczną."
    Construction start „18.04.2013 – wmurowanie kamienia węgielnego pod budowę inwestycji"
  2. Money.pl Apr 2019
    StatusDeliveryCostInvestorStage history
    Investor „Należący do PKN Orlen blok gazowo-parowy (CCGT) we Włocławku"
    Status „Prace przy budowie bloku CCGT Włocławek o mocy 463 MWe zakończone zostały z opóźnieniem w czerwcu 2017 roku"
    Cost „Łączne nakłady inwestycyjne poniesione przez spółkę na realizację projektu budowy elektrowni wyniosły ok. 1,4 mld zł."
  3. PKN Orlen 28 Mar 2018
    StageStage historyInvestor
    Stage „pracuje stabilnie, dostarczając parę technologiczną do ANWIL"
    locations[0] „Blok gazowo-parowy ma moc 463 MWe i pracuje we Włocławku. Stanowi źródło pary technologicznej dla ANWIL"