 "schema_version": 1,
 "snapshot_date": "2026-09-09",
 "generated_by": "pipeline.snapshot",
 "record_count": 383,
 "fields": [
  "status",
  "stage",
  "cost_mln",
  "cost_currency",
  "planned_end_current"
 ],
 "projects": {
  "120-mm-m120-rak-self-propelled-mortar-company-fire-modules": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 968.319188,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "a1-motorway-czestochowa-pyrzowice": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 3014,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "a1-motorway-kowal-strykow-2012-wave": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 5714.12,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "a1-motorway-lodz-north-tuszyn": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1027.41,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "a1-motorway-pyrzowice-piekary-slaskie": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1500,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "a1-motorway-sosnica-gliwice-swierklany": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2233.4,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "a1-motorway-swierklany-gorzyczki-czech-border-mszana-bridge": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1100,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "a1-motorway-torun-south-kowal": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1791,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "a4-motorway-jaroslaw-korczowa-ukrainian-border": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1787.7,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "a4-motorway-krakow-szarow": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 839.33,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "a4-motorway-rzeszow-jaroslaw": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 985.71,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "a4-motorway-tarnow-krzyz-rzeszow": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 5295.49,
   "cost_currency": "PLN",
   "planned_end_current": "2015-06-30"
  },
  "a4-motorway-zgorzelec-krzyzowa": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1137.79837084,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "a8-wroclaw-motorway-bypass-incl-redzinski-cable-stayed-bridge": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 4000,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "air-base-infrastructure-build-out-for-f-16-krzesiny-and-lask": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1813.355,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "arcelormittal-poland-hot-rolling-mill-in-krakow-former-sendzimir-steelworks": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1200,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "autostrada-a1-gdansk-torun": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 730,
   "cost_currency": "EUR",
   "planned_end_current": null
  },
  "autostrada-a1-tuszyn-czestochowa-dokonczenie-a1": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 3696.91,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "autostrada-a2-na-wschod-warszawa-lubelska-biala-podlaska-ter": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 4600,
   "cost_currency": "PLN",
   "planned_end_current": "2029"
  },
  "autostrada-a2-swiecko-warszawa": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "autostrada-a4-krakow-katowice": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 380,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "azure-poland-central": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1000,
   "cost_currency": "USD",
   "planned_end_current": null
  },
  "baltic-hub-t3": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2000,
   "cost_currency": "PLN",
   "planned_end_current": "2025"
  },
  "baltic-pipe": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 874,
   "cost_currency": "EUR",
   "planned_end_current": "2022-10"
  },
  "basell-orlen-polyolefins-polypropylene-polyethylene-plants-in-plock": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2010,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "baza-przeciwrakietowa-aegis-ashore-w-redzikowie": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 900,
   "cost_currency": "USD",
   "planned_end_current": "2024"
  },
  "belchatow-power-plant-flue-gas-desulfurisation-fgd-programme": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 9000,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "bess-zarnowiec": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 1555,
   "cost_currency": "PLN",
   "planned_end_current": "2027"
  },
  "blachownia-ccgt-850-mw-block-tauron-kghm-abandoned": {
   "status": "cancelled",
   "stage": "announced",
   "cost_mln": 3500,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "blok-gazowo-parowy-ccgt-stalowa-wola-450-mw": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1600,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "blok-gazowo-parowy-w-ec-zeran-warszawa-497-mw": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1600,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "blok-igcc-przy-kopalni-bogdanka-zgazowanie-wegla-enea-mitsub": {
   "status": "cancelled",
   "stage": "announced",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "bloki-gazowo-parowe-dolna-odra-gryfino-2x-700-mw": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 4730,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "bloki-gazowo-parowe-w-elektrowni-kozienice-2x-ccgt-1336-mw": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 6950,
   "cost_currency": "PLN",
   "planned_end_current": "2029-06-30"
  },
  "cadbury-cadbury-wedel-mondelez-chocolate-chewing-gum-factory-in-skarbimierz": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 865.5,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "camila-narodowa-konstelacja-satelitow-obserwacyjnych-esa-kpo": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 51.9,
   "cost_currency": "EUR",
   "planned_end_current": "2029-11"
  },
  "camp-kosciuszko-wysuniete-dowodztwo-v-korpusu-us-army-poznan": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "casa-c-295m-medium-transport-aircraft-2001-contract": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 211.5,
   "cost_currency": "USD",
   "planned_end_current": null
  },
  "ccgt-grudziadz-ii-blok-ii": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 3100,
   "cost_currency": "PLN",
   "planned_end_current": "2029"
  },
  "ccgt-ostroleka": {
   "status": "in_progress",
   "stage": "commissioning",
   "cost_mln": 2850,
   "cost_currency": "PLN",
   "planned_end_current": "2026"
  },
  "ccgt-wloclawek-463-mw": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1400,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "central-register-of-vehicles-and-drivers-cepik-2-0": {
   "status": "in_progress",
   "stage": "operational",
   "cost_mln": 149.9,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "central-trunk-line-line-4-upgrade-to-200-km-h-for-pendolino-grodzisk-maz-zawierc": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "centralny-zintegrowany-szpital-kliniczny-w-poznaniu": {
   "status": "in_progress",
   "stage": "commissioning",
   "cost_mln": 860,
   "cost_currency": "PLN",
   "planned_end_current": "2027"
  },
  "centrum-nauki-kopernik": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 365,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "cerad-centrum-radiofarmaceutykow-ncbj-swierk": {
   "status": "in_progress",
   "stage": "commissioning",
   "cost_mln": 147.8,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "ckd2-um-lodz-akademicki-osrodek-onkologiczny": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 798.5,
   "cost_currency": "PLN",
   "planned_end_current": "2026"
  },
  "coastal-missile-squadron-nsm-system-first-squadron": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "construction-of-olsztyn-tram-network-new-system-with-solaris-tramino-fleet": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 650.14,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "construction-of-the-tram-line-to-fordon-in-bydgoszcz": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 437.31,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "cpk": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 131700,
   "cost_currency": "PLN",
   "planned_end_current": "2032"
  },
  "cpk-lotnisko": {
   "status": "in_progress",
   "stage": "tender",
   "cost_mln": 42700,
   "cost_currency": "PLN",
   "planned_end_current": "2032"
  },
  "cyberbezpieczny-samorzad-i-kontynuacja-ferc-kpo": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 1507.08,
   "cost_currency": "PLN",
   "planned_end_current": "2026-09-30"
  },
  "daewoo-fso-motor-car-plant-at-zeran-warsaw": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 3711,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "dct-gdansk-deepwater-container-terminal-baltic-hub-terminal-t2": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 200,
   "cost_currency": "EUR",
   "planned_end_current": null
  },
  "dct-gdansk-terminal-kontenerowy": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 200,
   "cost_currency": "USD",
   "planned_end_current": null
  },
  "dell-computer-factory-in-lodz-olechow": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 756.9,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "diesel-hydrodesulphurization-unit-hon-vii-pkn-orlen-plock": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 500,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "digital-poland-op-broadband-access-networks-measure-1-1": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 4266.47,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "droga-ekspresowa-s10-bydgoszcz-torun": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 2100,
   "cost_currency": "PLN",
   "planned_end_current": "2027"
  },
  "droga-ekspresowa-s17-piaski-hrebenne-granica-z-ukraina": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": "2028"
  },
  "droga-ekspresowa-s19-via-carpatia-odcinek-polski": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 27000,
   "cost_currency": "PLN",
   "planned_end_current": "2031"
  },
  "droga-ekspresowa-s8-wroclaw-magnice-klodzko": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": "2033"
  },
  "druga-elektrownia-jadrowa": {
   "status": "planned",
   "stage": "announced",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": "2040"
  },
  "e-health-platform-p1": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 712.64,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "e-taxes-e-declarations-ministry-of-finance-it-programme": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 900,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "eastern-poland-broadband-network": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1259.28,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "ecogenerator-waste-thermal-treatment-plant-in-szczecin": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 698,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "efra-effective-refining-project-delayed-coking-complex-lotos-gdansk-refinery": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2300,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "ej-lubiatowo-kopalino": {
   "status": "in_progress",
   "stage": "permits",
   "cost_mln": 192000,
   "cost_currency": "PLN",
   "planned_end_current": "2036"
  },
  "ej-zarnowiec": {
   "status": "cancelled",
   "stage": "construction",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "elektrocieplownia-czechnica-2-siechnice": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1400,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "elektrownia-belchatow-blok-858mw": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1200,
   "cost_currency": "EUR",
   "planned_end_current": null
  },
  "elektrownia-gazowo-parowa-ccgt-grudziadz-blok-i-563-mw": {
   "status": "in_progress",
   "stage": "commissioning",
   "cost_mln": 2000,
   "cost_currency": "PLN",
   "planned_end_current": "2026"
  },
  "elektrownia-gazowo-parowa-nowy-rybnik-ccgt-rybnik-882-mw": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 3000,
   "cost_currency": "PLN",
   "planned_end_current": "2027-03-06"
  },
  "elektrownia-opole-bloki-1-4": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "elektrownia-ostroleka-c": {
   "status": "cancelled",
   "stage": "construction",
   "cost_mln": 6023,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "elektrownia-polnoc-rajkowy-k-pelplina": {
   "status": "cancelled",
   "stage": "permits",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "elektrownia-szczytowo-pompowa-mloty-reaktywacja": {
   "status": "in_progress",
   "stage": "permits",
   "cost_mln": 5000,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "elektrownia-szczytowo-pompowa-roznow-ii": {
   "status": "planned",
   "stage": "permits",
   "cost_mln": 6800,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "elektrownia-szczytowo-pompowa-tolkmicko": {
   "status": "planned",
   "stage": "announced",
   "cost_mln": 6500,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "ergo-arena-indoor-arena-on-the-gdansk-sopot-border": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 346,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "esa-centrum-bezpieczenstwa-cywilnego-i-odpornosci-warszawa": {
   "status": "planned",
   "stage": "announced",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "eurohpc-pl-superkomputer-helios-cyfronet": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 221.86,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "europejskie-centrum-filmowe-camerimage-w-toruniu": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 600,
   "cost_currency": "PLN",
   "planned_end_current": "2028"
  },
  "europejskie-centrum-solidarnosci-gdansk": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 225.80993546,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "expansion-and-modernization-of-the-czajka-wastewater-treatment-plant-in-warsaw-w": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 3700,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "expansion-of-wierzchowice-underground-gas-storage-to-1-2-bln-m3": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1960,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "f-16c-d-block-52-multirole-fighter-acquisition-peace-sky": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 3500,
   "cost_currency": "USD",
   "planned_end_current": null
  },
  "fabryka-elektrycznych-vanow-mercedes-benz-van-ea-w-jaworze": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 1000,
   "cost_currency": "EUR",
   "planned_end_current": "2026"
  },
  "fabryka-folii-miedzianej-sk-nexilis-w-stalowej-woli": {
   "status": "in_progress",
   "stage": "commissioning",
   "cost_mln": 3000,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "fabryka-materialow-katodowych-ionway-umicore-powerco-vw-w-ny": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 1700,
   "cost_currency": "EUR",
   "planned_end_current": "2026"
  },
  "fabryka-materialow-katodowych-umicore-w-nysie": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "fabryka-pepsico-frito-lay-swiete": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1000,
   "cost_currency": "PLN",
   "planned_end_current": "2023-05"
  },
  "fabryka-prochu-i-amunicji-155mm-pionki-eurenco-pgz": {
   "status": "in_progress",
   "stage": "announced",
   "cost_mln": 250,
   "cost_currency": "EUR",
   "planned_end_current": "2029"
  },
  "fabryka-samochodow-elektrycznych-w-jaworznie-d-izera-electro": {
   "status": "planned",
   "stage": "announced",
   "cost_mln": 4500,
   "cost_currency": "PLN",
   "planned_end_current": "2029"
  },
  "fabryka-silnikow-i-baterii-mercedes-benz-w-jaworze": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 600,
   "cost_currency": "EUR",
   "planned_end_current": null
  },
  "fabryka-systemow-bateryjnych-northvolt-w-gdansku-northvolt-d": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 200,
   "cost_currency": "USD",
   "planned_end_current": null
  },
  "fabryka-volkswagen-crafter-we-wrzesni": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 800,
   "cost_currency": "EUR",
   "planned_end_current": "2016"
  },
  "falochrony-oslonowe-portu-zewnetrznego-w-gdyni": {
   "status": "in_progress",
   "stage": "permits",
   "cost_mln": 539.6,
   "cost_currency": "PLN",
   "planned_end_current": "2028"
  },
  "farma-fotowoltaiczna-zwartowo": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 200,
   "cost_currency": "EUR",
   "planned_end_current": "2022-09"
  },
  "farma-wiatrowa-miejska-gorka-tauron": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 2000,
   "cost_currency": "PLN",
   "planned_end_current": "2027"
  },
  "farma-wiatrowa-potegowo": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1250,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "fiat-gm-fca-powertrain-engine-plant-in-bielsko-biala-1-3-multijet-diesel": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1628,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "filharmonia-szczecin": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 118.918,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "first-modernization-of-railway-line-e20-warsaw-poznan-kunowice-phare-ispa-eib-16": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "flood-protection-programme-for-the-upper-vistula-basin": {
   "status": "superseded",
   "stage": null,
   "cost_mln": 13151,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "flyeye-bsp-rozpoznawcze-190-zestawow-safe-2026": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 1533.667,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "formowanie-i-infrastruktura-1-dywizji-piechoty-legionow": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "fregaty-miecznik-arrowhead-140-pgz-stocznia-gdynia": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 15000,
   "cost_currency": "PLN",
   "planned_end_current": "2031"
  },
  "gawron-corvette-orp-slazak-patrol-ship": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 638.1,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "gaz-system-2009-2015-investment-programme-north-south-gas-corridor-trunk-pipelin": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 3800,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "gazociag-gustorzyn-wronow": {
   "status": "completed",
   "stage": "commissioning",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "gazociag-jamal-europa-polski-odcinek": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "gazociag-polska-litwa-gipl": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 558,
   "cost_currency": "EUR",
   "planned_end_current": "2022-05"
  },
  "gigafabryka-baterii-lg-energy-solution-wroclaw-biskupice-pod": {
   "status": "in_progress",
   "stage": "operational",
   "cost_mln": 3200,
   "cost_currency": "EUR",
   "planned_end_current": null
  },
  "gladius-bezzalogowy-system-poszukiwawczo-uderzeniowy-safe-2026": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 9311.212,
   "cost_currency": "PLN",
   "planned_end_current": "2030"
  },
  "glogow-gleboki-przemyslowy-program-udostepnienia-zloza-szyby": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 9000,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "h225m-caracal-multirole-helicopter-tender-cancelled-2016": {
   "status": "cancelled",
   "stage": "tender",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "harmony-link": {
   "status": "planned",
   "stage": "permits",
   "cost_mln": 700,
   "cost_currency": "EUR",
   "planned_end_current": "2030"
  },
  "homar-program-himars-rocket-artillery-fire-module-2019-contract": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": "2024"
  },
  "hydrogen-eagle-program-wodorowy-orlen": {
   "status": "in_progress",
   "stage": "tender",
   "cost_mln": 7400,
   "cost_currency": "PLN",
   "planned_end_current": "2035"
  },
  "hyperpic-fabryka-fotonicznych-ukladow-scalonych-vigo-photoni": {
   "status": "in_progress",
   "stage": "announced",
   "cost_mln": 1000,
   "cost_currency": "PLN",
   "planned_end_current": "2030"
  },
  "ice-krakow-congress-centre": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 357.53904363,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "iii-linia-metra-w-warszawie-etap-i-praga-poludnie-stadion-na": {
   "status": "planned",
   "stage": "permits",
   "cost_mln": 5952,
   "cost_currency": "PLN",
   "planned_end_current": "2032"
  },
  "improvement-of-water-quality-in-szczecin-pomorzany-and-zdroje-treatment-plants-i": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1110.4,
   "cost_currency": "PLN",
   "planned_end_current": "2010-12-31"
  },
  "infrastruktura-bazy-f-35-swidwin-21blt": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 2500,
   "cost_currency": "PLN",
   "planned_end_current": "2026"
  },
  "instalacja-hvo-w-plocku-uwodornienie-olejow-roslinnych": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 800,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "instalacja-visbreakingu-w-zakladzie-produkcyjnym-w-plocku": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 750,
   "cost_currency": "PLN",
   "planned_end_current": "2024-05"
  },
  "intel-wroclaw": {
   "status": "cancelled",
   "stage": "announced",
   "cost_mln": 4600,
   "cost_currency": "USD",
   "planned_end_current": null
  },
  "interkonektor-gazowy-polska-slowacja": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 100,
   "cost_currency": "EUR",
   "planned_end_current": "2022-10"
  },
  "international-congress-centre-in-katowice": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 378,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "internet-for-masovia-broadband-network": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 458,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "isuzu-motors-polska-diesel-engine-plant-in-tychy": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 766,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "itpo-dobra-energia-olsztyn": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 883.7,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "itpo-veolia-nowa-energia-lodz-ec4": {
   "status": "planned",
   "stage": "permits",
   "cost_mln": 1855.725,
   "cost_currency": "PLN",
   "planned_end_current": "2028"
  },
  "izera": {
   "status": "cancelled",
   "stage": "announced",
   "cost_mln": 580,
   "cost_currency": "PLN",
   "planned_end_current": "2025"
  },
  "jaworzno-iii-power-plant-unit-910-mw-hard-coal": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 4537.8,
   "cost_currency": "PLN",
   "planned_end_current": "2020-01-31"
  },
  "kampus-atman-data-center-warsaw-3-waw-3-w-duchnicach": {
   "status": "in_progress",
   "stage": "operational",
   "cost_mln": 2500,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "kampus-centrum-danych-data4-w-jawczycach-pod-warszawa": {
   "status": "in_progress",
   "stage": "operational",
   "cost_mln": 600,
   "cost_currency": "EUR",
   "planned_end_current": null
  },
  "kampus-centrum-danych-vantage-waw1-w-warszawie": {
   "status": "in_progress",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "kanal-slaski": {
   "status": "planned",
   "stage": "announced",
   "cost_mln": 11000,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "kdp-y": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 80000,
   "cost_currency": "PLN",
   "planned_end_current": "2035"
  },
  "kompleks-bioetanolu-ii-generacji-w-jedliczu-orlen-poludnie": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 1120,
   "cost_currency": "PLN",
   "planned_end_current": "2027"
  },
  "kompleks-gubin-brody-kopalnia-i-elektrownia-na-weglu-brunatn": {
   "status": "cancelled",
   "stage": "permits",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "kompleksowa-rewitalizacja-i-rozbudowa-narodowego-instytutu-o": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 872,
   "cost_currency": "PLN",
   "planned_end_current": "2028"
  },
  "komputer-kwantowy-piast-q-euroqcs-poland": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 12.28,
   "cost_currency": "EUR",
   "planned_end_current": null
  },
  "kopalnia-wegla-koksowego-bzie-debina-jsw": {
   "status": "in_progress",
   "stage": "operational",
   "cost_mln": 3000,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "kormoran-ii-mine-countermeasure-vessels-project-258-first-phase": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1200,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "kozienice-power-plant-unit-b11-1075-mw-hard-coal": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 5100,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "kpo-c1-1-1-szybki-internet-na-obszarach-bialych-plam": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 2458.29,
   "cost_currency": "PLN",
   "planned_end_current": "2026-08-31"
  },
  "krajowe-centrum-serwisowe-samolotow-fa-50-w-wzl-nr-2-bydgosz": {
   "status": "in_progress",
   "stage": "announced",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "krakow-balice-airport-new-passenger-terminal-mpl-expansion": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 412,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "krakow-fast-tram-kst-premetro-program-stage-i-tunnel-stages-ii": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 212,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "krakowski-szybki-tramwaj-etap-iii": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 595.19,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "kto-rosomak-wheeled-apc-program-patria-amv-licence": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 4925,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "lagisza-power-plant-unit-460-mw-world-s-first-supercritical-cfb": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1900,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "leopard-2a4-to-leopard-2pl-modernization-program": {
   "status": "in_progress",
   "stage": "commissioning",
   "cost_mln": 2415,
   "cost_currency": "PLN",
   "planned_end_current": "2027"
  },
  "lg-cluster-in-kobierzyce-biskupice-podgorne-lg-display-lcd-lg-electronics": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1732,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "litpol-link-poland-lithuania-400-kv-electricity-interconnector-elk-alytus": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2139.7584,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "lodz-regional-tram-ltr": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 281,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "lodz-w-z-tram-route-retkinia-widzew": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 747,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "lotnisko-warszawa-radom": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 800,
   "cost_currency": "PLN",
   "planned_end_current": "2023-04"
  },
  "lubiatow-miedzychod-grotow-lmg-oil-and-gas-field-mine-pgnig": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1700,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "lublin-airport-swidnik-greenfield-airport-construction": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 475,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "m-346-master-bielik-advanced-jet-trainers-2014-contract": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "magazyn-energii-nowa-wies-elcka-bess-elk-200-mw-800-mwh": {
   "status": "in_progress",
   "stage": "commissioning",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "malczyce-barrage-weir-on-the-oder": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1100,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "man-truck-bus-heavy-truck-factory-in-niepolomice": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 378,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "maria-sklodowska-curie-bridge-north-bridge-warsaw": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1150.581207,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "metro-m2-warszawa": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 10000,
   "cost_currency": "PLN",
   "planned_end_current": "2026-11-09"
  },
  "metro-w-krakowie-linia-1": {
   "status": "planned",
   "stage": "permits",
   "cost_mln": 13000,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "metro-warszawskie-linia-m1": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "mfw-baltic-power": {
   "status": "in_progress",
   "stage": "commissioning",
   "cost_mln": 4730,
   "cost_currency": "EUR",
   "planned_end_current": "2026"
  },
  "mfw-baltica-2": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 30000,
   "cost_currency": "PLN",
   "planned_end_current": "2027"
  },
  "michelin-tyre-plant-investments-in-olsztyn-former-stomil": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 407.1,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "mikroglob-system-satelitarnej-obserwacji-ziemi-dla-sz-rp": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 556.7,
   "cost_currency": "PLN",
   "planned_end_current": "2027"
  },
  "mikrosar": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 860,
   "cost_currency": "PLN",
   "planned_end_current": "2026"
  },
  "modernizacja-i-rozbudowa-lotniska-chopina-w-warszawie": {
   "status": "in_progress",
   "stage": "tender",
   "cost_mln": 940,
   "cost_currency": "PLN",
   "planned_end_current": "2029"
  },
  "modernizacja-linii-e30-katowice-krakow": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 2000,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "modernizacja-linii-e59-poznan-glowny-szczecin-dabie": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 4000,
   "cost_currency": "PLN",
   "planned_end_current": "2025-09"
  },
  "modernizacja-linii-nr-201-maksymilianowo-gdynia-magistrala-w": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": "2032"
  },
  "modernizacja-toru-wodnego-i-rozbudowa-nabrzezy-w-porcie-wewn": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 595,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "modernizacja-toru-wodnego-swinoujscie-szczecin-do-12-5-m": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1963.75,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "modernizacja-zabudowy-regulacyjnej-odry-granicznej": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 470,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "modernization-of-railway-line-8-warszawa-okecie-radom": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1945.53,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "modernization-of-railway-line-e20-siedlce-terespol": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1115.15,
   "cost_currency": "PLN",
   "planned_end_current": "2015"
  },
  "modernization-of-railway-line-e30-ce30-krakow-rzeszow-podleze-rzeszow": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 4672.08,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "modernization-of-railway-line-e59-wroclaw-poznan": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1704.9,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "modernization-of-railway-line-e65-warsaw-gdynia-line-9": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 3200,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "modernization-of-railway-line-warsaw-lodz-lines-1-17-stages-i-and-ii": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 870,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "modernization-of-the-wroclaw-water-node-flood-protection-system-rebuild-for-wroclaw": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1411,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "mondi-swiecie-new-mp7-paper-machine-and-packaging-line": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1515,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "morska-farma-wiatrowa-baltica-1": {
   "status": "planned",
   "stage": "permits",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "morska-farma-wiatrowa-baltica-3": {
   "status": "planned",
   "stage": "permits",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "morska-farma-wiatrowa-baltyk-1-mfw-baltyk-i": {
   "status": "planned",
   "stage": "permits",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": "2032"
  },
  "morska-farma-wiatrowa-baltyk-2-mfw-baltyk-ii": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 3000,
   "cost_currency": "EUR",
   "planned_end_current": "2028"
  },
  "morska-farma-wiatrowa-baltyk-3-mfw-baltyk-iii": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 3000,
   "cost_currency": "EUR",
   "planned_end_current": "2028"
  },
  "morska-farma-wiatrowa-bc-wind": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 2000,
   "cost_currency": "EUR",
   "planned_end_current": "2028"
  },
  "morska-farma-wiatrowa-f-e-w-baltic-ii-obecnie-pge": {
   "status": "planned",
   "stage": "permits",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": "2032"
  },
  "municipal-waste-thermal-treatment-plant-itpok-in-bydgoszcz": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 522.571,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "municipal-waste-thermal-treatment-plant-itpok-in-poznan": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 832,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "muzeum-historii-polski-na-cytadeli-warszawskiej": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 1200,
   "cost_currency": "PLN",
   "planned_end_current": "2027-06-04"
  },
  "muzeum-ii-wojny-swiatowej-gdansk": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 448.9,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "muzeum-polin": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 320,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "muzeum-sztuki-nowoczesnej-w-warszawie-nowa-siedziba": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 652.5,
   "cost_currency": "PLN",
   "planned_end_current": "2024"
  },
  "naftoport-marine-crude-oil-and-fuels-transhipment-terminal-port-polnocny-gdansk": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "narodowa-rezerwa-amunicyjna": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 14000,
   "cost_currency": "PLN",
   "planned_end_current": "2029"
  },
  "national-educational-network": {
   "status": "in_progress",
   "stage": "operational",
   "cost_mln": 320,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "national-forum-of-music-in-wroclaw": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 460,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "national-municipal-wastewater-treatment-programme-kposk": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 28700,
   "cost_currency": "PLN",
   "planned_end_current": "2027"
  },
  "national-synchrotron-radiation-centre-solaris-in-krakow": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 200,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "national-teleinformatics-network-for-emergency-number-112-ost-112": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 149,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "new-seat-of-the-polish-army-museum-at-the-warsaw-citadel": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 256,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "new-seat-of-the-silesian-museum-in-katowice": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 273.719885,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "nowa-siedziba-szpitala-uniwersyteckiego-w-krakowie-prokocim": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1200,
   "cost_currency": "PLN",
   "planned_end_current": "2019-05"
  },
  "nowy-dworzec-lodz-fabryczna-z-wezlem-multimodalnym": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1750,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "nowy-szpital-powiatowy-nysa": {
   "status": "planned",
   "stage": null,
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": "2028"
  },
  "obwodnica-aglomeracji-warszawskiej-a50-s50": {
   "status": "planned",
   "stage": "announced",
   "cost_mln": 18400,
   "cost_currency": "PLN",
   "planned_end_current": "2035"
  },
  "obwodnica-metropolitalna-trojmiasta-s6": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2890,
   "cost_currency": "PLN",
   "planned_end_current": "2025"
  },
  "odkrywka-zloczew-wegiel-brunatny-dla-belchatowa": {
   "status": "cancelled",
   "stage": "permits",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "odra-river-basin-flood-protection-project-world-bank-ceb-financing": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 505,
   "cost_currency": "EUR",
   "planned_end_current": "2020-06-30"
  },
  "olefiny-iii-nowa-chemia": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 35800,
   "cost_currency": "PLN",
   "planned_end_current": "2030"
  },
  "opel-general-motors-manufacturing-poland-car-plant-in-gliwice": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 970.6,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "opole-power-plant-units-5-6-2x900-mw-hard-coal": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 9397,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "orlen-olefiny-iii-pierwotny-zakres": {
   "status": "superseded",
   "stage": "construction",
   "cost_mln": 51000,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "osrodek-systemow-autonomicznych-osa-wojska-dronowe": {
   "status": "in_progress",
   "stage": null,
   "cost_mln": 25000,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "palac-saski": {
   "status": "in_progress",
   "stage": "permits",
   "cost_mln": 2450,
   "cost_currency": "PLN",
   "planned_end_current": "2030"
  },
  "patnow-ii-power-plant-unit-464-mw-lignite": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1908.3,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "pcmd-rzeszow-podkarpackie-centrum-medycyny-dzieciecej": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 763.25,
   "cost_currency": "PLN",
   "planned_end_current": "2029-10"
  },
  "pl-id-electronic-identity-document-programme": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 511,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "plock-ccgt-combined-cycle-block-pkn-orlen-600-mw": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1700,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "pmg-kosakowo-kawernowy-magazyn-gazu": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 514,
   "cost_currency": "PLN",
   "planned_end_current": "2021"
  },
  "podleze-piekielko-nowa-linia-kolejowa-58-km-modernizacja-lin": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 17000,
   "cost_currency": "PLN",
   "planned_end_current": "2030"
  },
  "poglebienie-toru-podejsciowego-i-akwenow-wewnetrznych-portu": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1280,
   "cost_currency": "PLN",
   "planned_end_current": "2026"
  },
  "polaczenie-stalopradowe-hvdc-polnoc-poludnie-pse": {
   "status": "planned",
   "stage": "announced",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": "2032"
  },
  "polaniec-power-plant-green-unit-205-mw-100-biomass": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1000,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "polder-raciborz-dolny": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1995.18,
   "cost_currency": "PLN",
   "planned_end_current": "2019"
  },
  "polimery-police": {
   "status": "in_progress",
   "stage": "commissioning",
   "cost_mln": 7200,
   "cost_currency": "PLN",
   "planned_end_current": "2027"
  },
  "polonizacja-produkcji-czolgow-k2pl-w-zm-bumar-labedy-gliwice": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 850,
   "cost_currency": "PLN",
   "planned_end_current": "2030"
  },
  "poludniowa-obwodnica-warszawy-s2-z-tunelem-pod-ursynowem": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 4600,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "pomeranian-metropolitan-railway-new-line-gdansk-wrzeszcz-airport-kartuzy-koscier": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 907,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "poprawa-dostepu-do-portu-gdansk-modernizacja-toru-wodnego-2": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 533,
   "cost_currency": "PLN",
   "planned_end_current": "2028"
  },
  "port-czystej-energii-itpok-gdansk": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 661,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "port-lotniczy-warszawa-modlin": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 451.4,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "port-zewnetrzny-w-porcie-gdynia-glebokowodny-terminal-konten": {
   "status": "planned",
   "stage": "tender",
   "cost_mln": 5000,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "poznan-fast-tram-pst-northern-trunk": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "produkcja-i-serwis-armatohaubic-k9pl-w-hucie-stalowa-wola": {
   "status": "in_progress",
   "stage": "announced",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "program-10-grupa-lotos-gdansk-refinery-expansion": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 5500,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "program-budowy-100-obwodnic-na-lata-2020-2030": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 28000,
   "cost_currency": "PLN",
   "planned_end_current": "2030"
  },
  "program-budowy-promow-dla-polskich-armatorow-program-batory": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 1300,
   "cost_currency": "PLN",
   "planned_end_current": "2028"
  },
  "program-homar-k-artyleria-rakietowa-chunmoo": {
   "status": "in_progress",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": "2029"
  },
  "program-inwestycyjny-katowice-airport-2024-2032-nowy-termina": {
   "status": "in_progress",
   "stage": "tender",
   "cost_mln": 1800,
   "cost_currency": "PLN",
   "planned_end_current": "2032"
  },
  "program-inwestycyjny-portu-lotniczego-gdansk-2025-2028": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 500,
   "cost_currency": "PLN",
   "planned_end_current": "2028"
  },
  "program-mieszkanie-plus": {
   "status": "cancelled",
   "stage": "construction",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "program-modernizacji-pirometalurgii-piec-zawiesinowy-w-hucie": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2500,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "program-narew-obrona-powietrzna-krotkiego-zasiegu": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 930.17,
   "cost_currency": "PLN",
   "planned_end_current": "2035"
  },
  "program-ochrony-ludnosci-i-obrony-cywilnej-schrony": {
   "status": "in_progress",
   "stage": "announced",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": "2026"
  },
  "program-pilica-plus-obrona-przeciwlotnicza-vshorad": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 2980,
   "cost_currency": "PLN",
   "planned_end_current": "2029"
  },
  "program-smr-osge": {
   "status": "in_progress",
   "stage": "permits",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "program-wisla-obrona-powietrzna-sredniego-zasiegu": {
   "status": "in_progress",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": "2031"
  },
  "programme-for-the-oder-2006-multi-year-modernization-of-the-oder-water-system": {
   "status": "superseded",
   "stage": "construction",
   "cost_mln": 9048.96,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "projekt-hbo-hydrokrakingowy-blok-olejowy-w-rafinerii-gdanski": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 1800,
   "cost_currency": "PLN",
   "planned_end_current": "2026"
  },
  "projekt-ochrony-przeciwpowodziowej-w-dorzeczu-odry-i-wisly-p": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1202,
   "cost_currency": "EUR",
   "planned_end_current": "2025"
  },
  "protective-breakwater-for-the-external-port-in-swinoujscie-lng-terminal-shelter": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1016.754,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "przebudowa-dk18-do-standardu-autostrady-a18-jezdnia-poludnio": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 900,
   "cost_currency": "PLN",
   "planned_end_current": "2023"
  },
  "przebudowa-drogi-startowej-i-drog-kolowania-portu-lotniczego": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 113.8,
   "cost_currency": "PLN",
   "planned_end_current": "2026-09"
  },
  "przebudowa-stacji-warszawa-wschodnia": {
   "status": "in_progress",
   "stage": "tender",
   "cost_mln": 3635.62,
   "cost_currency": "PLN",
   "planned_end_current": "2029"
  },
  "przebudowa-stacji-warszawa-zachodnia": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2600,
   "cost_currency": "PLN",
   "planned_end_current": "2024"
  },
  "przekop-mierzei-wislanej": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 1984.05,
   "cost_currency": "PLN",
   "planned_end_current": "2027-02"
  },
  "przylaczenie-do-natowskiego-systemu-rurociagow-paliwowych-ceps": {
   "status": "in_progress",
   "stage": "permits",
   "cost_mln": 20000,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "pse-plan-rozwoju-sieci": {
   "status": "in_progress",
   "stage": "announced",
   "cost_mln": 64000,
   "cost_currency": "PLN",
   "planned_end_current": "2034"
  },
  "pum-szczecin-centrum-kliniczno-dydaktyczno-badawcze": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 812.742418,
   "cost_currency": "PLN",
   "planned_end_current": "2026"
  },
  "purchase-of-186-pesa-120na-swing-trams-for-warsaw-trams": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1497.6,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "purchase-of-20-newag-stadler-flirt-ed160-electric-multiple-units-for-pkp-interci": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1621,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "purchase-of-20-pesa-dart-ed161-electric-multiple-units-for-pkp-intercity": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1320.6264,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "purchase-of-35-siemens-inspiro-trains-for-warsaw-metro": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1069.594,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "purchase-of-up-to-213-trams-for-warsaw-trams-2019-tender": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1825,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "px-pta-complex-paraxylene-plock-and-purified-terephthalic-acid-wloclawek-pkn-orl": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 4120,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "rail-baltica-e75": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": "2030"
  },
  "reaktor-maria-ncbj-swierk": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "reconstruction-of-the-silesian-stadium-stadion-slaski-in-chorzow": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 650,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "region-google-cloud-warszawa": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2000,
   "cost_currency": "USD",
   "planned_end_current": null
  },
  "regional-broadband-networks-programme-regional-operational-programmes": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 3000,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "regionalne-centrum-kompetencyjne-czolgow-abrams-w-wzm-poznan": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "rozbudowa-autostrady-a2-lodz-warszawa-o-trzeci-czwarty-pas": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 1500,
   "cost_currency": "PLN",
   "planned_end_current": "2028"
  },
  "rozbudowa-autostrady-a4-krzyzowa-legnica-wroclaw-s5-sobotka": {
   "status": "planned",
   "stage": "permits",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "rozbudowa-i-modernizacja-portu-lotniczego-poznan-lawica": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 1274,
   "cost_currency": "PLN",
   "planned_end_current": "2027"
  },
  "rozbudowa-infrastruktury-chmurowej-i-ai-microsoft-w-polsce": {
   "status": "in_progress",
   "stage": "announced",
   "cost_mln": 2800,
   "cost_currency": "PLN",
   "planned_end_current": "2026-06"
  },
  "rozbudowa-krakow-airport-nowy-plan-inwestycyjny-terminal-eta": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 4200,
   "cost_currency": "PLN",
   "planned_end_current": "2032"
  },
  "rozbudowa-lotniska-chopina-warszawa": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 400,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "rozbudowa-ouow-zelazny-most-kwatera-poludniowa": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1000,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "rozbudowa-podziemnego-magazynu-gazu-wierzchowice-do-2-1-mld": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 576,
   "cost_currency": "PLN",
   "planned_end_current": "2026"
  },
  "rozbudowa-portu-lotniczego-warszawa-modlin-etap-i-i-ii": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 500,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "rozbudowa-portu-lotniczego-wroclaw-strefa-operacyjna-etap-i": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 377,
   "cost_currency": "PLN",
   "planned_end_current": "2026-12"
  },
  "rozbudowa-systemu-wodno-sciekowego-warszawa-czajka-feniks": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 546,
   "cost_currency": "PLN",
   "planned_end_current": "2028"
  },
  "rozbudowa-zdolnosci-produkcyjnych-huty-stalowa-wola-krab-bor": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 1371.8,
   "cost_currency": "PLN",
   "planned_end_current": "2030"
  },
  "rozbudowa-zdolnosci-produkcyjnych-mesko-s-a": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 887.2,
   "cost_currency": "PLN",
   "planned_end_current": "2028"
  },
  "rozbudowa-zdolnosci-produkcyjnych-nawozow-w-anwilu-wloclawek": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1700,
   "cost_currency": "PLN",
   "planned_end_current": "2023-07"
  },
  "rozbudowa-zdolnosci-produkcyjnych-zm-dezamet-amunicja-155-mm": {
   "status": "in_progress",
   "stage": "announced",
   "cost_mln": 1358,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "rybnik-power-plant-new-900-mw-coal-unit-edf-abandoned": {
   "status": "cancelled",
   "stage": "tender",
   "cost_mln": 7415,
   "cost_currency": "PLN",
   "planned_end_current": "2018"
  },
  "s1-obejscie-wegierskiej-gorki-przybedza-milowka": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1380,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "s17-expressway-warsaw-lublin": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 4000,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "s19-rzeszow-babica": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 3000,
   "cost_currency": "PLN",
   "planned_end_current": "2028-01-07"
  },
  "s22-expressway-elblag-grzechotki-russian-border": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 480.3,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "s3-bolkow-kamienna-gora-z-tunelem-ts-26-s3-legnica-lubawka": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1785,
   "cost_currency": "PLN",
   "planned_end_current": "2024-07"
  },
  "s3-expressway-gorzow-sulechow": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2111.59,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "s3-expressway-nowa-sol-legnica": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1977.02,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "s3-expressway-sulechow-nowa-sol": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1335.54,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "s3-expressway-szczecin-gorzow-wielkopolski": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2307,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "s5-expressway-poznan-wroclaw": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2353.3,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "s6-dokonczenie-koszalin-slupsk-bozepole-wielkie": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2900,
   "cost_currency": "PLN",
   "planned_end_current": "2026-06-26"
  },
  "s61-via-baltica": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 11000,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "s69-now-s1-expressway-bielsko-biala-zywiec-zwardon": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1184.24,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "s7-expressway-gdansk-elblag": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 3218,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "s7-expressway-skarzysko-kamienna-wystepa": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 719.15,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "s7-odcinek-naprawa-skomielna-biala-z-tunelem-pod-luboniem-ma": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2547.6,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "s7-southern-gdansk-bypass": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1580.833,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "s7-warszawa-gdansk-warszawa-krakow-odcinki-domykajace-koryta": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": "2026"
  },
  "s8-expressway-jezewo-bialystok": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 675,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "s8-expressway-konotopa-powazkowska-warsaw": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2149.235,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "s8-expressway-walichnowy-lodz-wroclaw-lodz-corridor": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 5099.46,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "s8-expressway-wyszkow-podlaskie-border": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1170.3665792,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "satelity-obserwacyjne-od-airbus-defence-space-2-satelity-sta": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 2700,
   "cost_currency": "PLN",
   "planned_end_current": "2027"
  },
  "saule-technologies": {
   "status": "cancelled",
   "stage": null,
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "second-line-of-the-yamal-europe-pipeline-yamal-ii-with-compressor-stations-aband": {
   "status": "cancelled",
   "stage": "announced",
   "cost_mln": 350,
   "cost_currency": "USD",
   "planned_end_current": null
  },
  "second-modernization-of-railway-line-e20-poznan-warsaw-swarzedz-sochaczew": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2300,
   "cost_currency": "PLN",
   "planned_end_current": "2023"
  },
  "sharp-lcd-module-factory-in-lysomice-near-torun-sharp-orion-park": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 595,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "siedziba-nospr-katowice": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 305.36437255,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "siekierkowski-bridge-siekierkowska-route-warsaw": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1626.114,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "silesian-trams-second-infrastructure-modernization-project-poiis-2014-2020": {
   "status": "completed",
   "stage": null,
   "cost_mln": 1570,
   "cost_currency": "PLN",
   "planned_end_current": "2023"
  },
  "silesian-trams-tram-infrastructure-modernization-in-upper-silesia-poiis-2007-201": {
   "status": "completed",
   "stage": null,
   "cost_mln": 800,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "sinfonia-varsovia-centrum-nowa-siedziba-i-najwieksza-sala-ko": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 768,
   "cost_currency": "PLN",
   "planned_end_current": "2030"
  },
  "spike-lr-anti-tank-guided-missiles-licensed-mesko-production": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1487,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "stadion-euro-2012-gdansk": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 709,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "stadion-euro-2012-poznan": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 747,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "stadion-euro-2012-wroclaw": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 947,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "stadion-narodowy-pge-narodowy-w-warszawie": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1976.061375,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "stopien-wodny-siarzewo": {
   "status": "paused",
   "stage": "permits",
   "cost_mln": 7500,
   "cost_currency": "PLN",
   "planned_end_current": "2032"
  },
  "swepol-link-poland-sweden-hvdc-submarine-power-cable": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2700,
   "cost_currency": "SEK",
   "planned_end_current": null
  },
  "system-antydronowy-san-tarcza-wschod": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 14924.815,
   "cost_currency": "PLN",
   "planned_end_current": "2028-01"
  },
  "system-antydronowy-skyctrl-aps": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 150,
   "cost_currency": "PLN",
   "planned_end_current": "2023"
  },
  "szczecinska-kolej-metropolitalna": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 1353.199,
   "cost_currency": "PLN",
   "planned_end_current": "2026-12-31"
  },
  "szczytowe-bloki-gazowe-pge-rybnik-dolna-odra": {
   "status": "planned",
   "stage": "tender",
   "cost_mln": 6000,
   "cost_currency": "PLN",
   "planned_end_current": "2030"
  },
  "szpital-onkologiczny-wroclaw": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 1500,
   "cost_currency": "PLN",
   "planned_end_current": "2027-08"
  },
  "szprychy-kolejowe-cpk-model-piasta-szprychy": {
   "status": "cancelled",
   "stage": "announced",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "tarcza-wschod": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 10000,
   "cost_currency": "PLN",
   "planned_end_current": "2028"
  },
  "terminal-1-portu-lotniczego-warszawa-okecie": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "terminal-fsru-w-zatoce-gdanskiej-program-fsru": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 4500,
   "cost_currency": "PLN",
   "planned_end_current": "2028"
  },
  "terminal-instalacyjny-morskich-farm-wiatrowych-orlen-neptun": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 39,
   "cost_currency": "EUR",
   "planned_end_current": null
  },
  "terminal-kontenerowy-swinoujscie": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 10000,
   "cost_currency": "PLN",
   "planned_end_current": "2030"
  },
  "terminal-lng-swinoujscie-2015": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 3638,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "terminal-lng-swinoujscie-rozbudowa": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1900,
   "cost_currency": "PLN",
   "planned_end_current": "2025"
  },
  "terminal-martwa-wisla-rafineria-gdanska": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 500,
   "cost_currency": "PLN",
   "planned_end_current": "2026"
  },
  "terminal-t5-w-porcie-gdansk-terminal-instalacyjny-offshore-w": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 1180,
   "cost_currency": "PLN",
   "planned_end_current": "2026-09"
  },
  "toyota-motor-manufacturing-poland-engine-gearbox-plant-in-walbrzych": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2083,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "tram-route-os-lecha-franowo-with-tunnel-in-poznan": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 261.38,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "tramwaj-do-mistrzejowic-kst-etap-iv-krakow-ppp": {
   "status": "in_progress",
   "stage": "commissioning",
   "cost_mln": 1920,
   "cost_currency": "PLN",
   "planned_end_current": "2026-09"
  },
  "tramwaj-do-wilanowa-warszawa": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 685.424,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "tramwaj-na-naramowice-poznan": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 550,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "tramwaje-slaskie-modernizacja-gzm-feniks": {
   "status": "in_progress",
   "stage": null,
   "cost_mln": 1300,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "tunel-pod-swina": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 913.8,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "tunel-srednicowy-lodz": {
   "status": "paused",
   "stage": "construction",
   "cost_mln": 2300,
   "cost_currency": "PLN",
   "planned_end_current": "2031"
  },
  "turow-power-plant-unit-11-496-mw-lignite": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 3646,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "us-army-equipment-storage-maintenance-complex-powidz-ltesm-c": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1500,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "usk-bialystok-rozbudowa-centrum-onkologii": {
   "status": "in_progress",
   "stage": null,
   "cost_mln": 948,
   "cost_currency": "PLN",
   "planned_end_current": "2029"
  },
  "volkswagen-motor-polska-diesel-engine-plant-in-polkowice": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 917.1,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "warmate-amunicja-krazaca-safe-2026": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 1081.835,
   "cost_currency": "PLN",
   "planned_end_current": "2030"
  },
  "warsaw-metro-line-2-m2-central-section-rondo-daszynskiego-dworzec-wilenski": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 4170,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "warszawska-wytwornia-energii-wte-targowek": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1668,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "warszawski-wezel-kolejowy-linia-srednicowa": {
   "status": "planned",
   "stage": "announced",
   "cost_mln": 9000,
   "cost_currency": "PLN",
   "planned_end_current": "2040"
  },
  "waste-thermal-treatment-plant-in-krakow-ekospalarnia": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 819,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "water-and-wastewater-management-in-krakow-plaszow-ii-plant-stages-i-vii-cohesion": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 366.11767196,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "water-supply-and-wastewater-treatment-in-lodz-group-wastewater-treatment-plant-is": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 711.784,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "wielkopolska-broadband-network": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 410.44,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "wojska-obrony-cyberprzestrzeni-kryptologia": {
   "status": "in_progress",
   "stage": "construction",
   "cost_mln": 10000,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "wroclaw-tramwaj-plus-program-new-tram-tracks": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 736.19,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "zakup-i-rozbudowa-kampusu-the-warsaw-hub-przez-google": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 700,
   "cost_currency": "USD",
   "planned_end_current": null
  },
  "zakup-pociagow-pendolino-ed250": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2640,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "zapora-granica-pl-by": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 1600,
   "cost_currency": "PLN",
   "planned_end_current": "2022-07-15"
  },
  "zbiornik-wodny-swinna-poreba": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 2200,
   "cost_currency": "PLN",
   "planned_end_current": null
  },
  "zespol-elektrowni-wodnych-czorsztyn-niedzica": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": null,
   "cost_currency": null,
   "planned_end_current": null
  },
  "zielona-gora-chp-combined-cycle-block-190-mwe": {
   "status": "completed",
   "stage": "operational",
   "cost_mln": 532,
   "cost_currency": "PLN",
   "planned_end_current": null
  }
 }
}